20New Thermocouple InstallationI uncoiled the new Thermocouple and straightened it out to its full length….54”. I inserted theprobe end into the burner box and routed the rest of it similarly to the old one and positioned theupper end near the interrupter so that I could thread it into the interrupter opening. I snugged thefitting gently but firmly. I installed three new cable ties in approximately the same position as theold ones and the refrigerator was ready to go back into the coach. I would like to have tested therefrigerator operation before reinstalling it. However, I did not have any means of supplying gasto the refrigerator while it was out.