Installation manualPreparation of components:Sort the components based on thewall plans (see Technicalspecifications) and place them atthe four sides of the house in theinstallation sequence.ATTENTION: Never place thecomponents directly on grass or amuddy surface because it will bevery difficult or even impossible toclean them up later!FoundationA good foundation is the most important aspect guaranteeing the duration and safety of your house.Only a completely level, rectangular and bearing foundation will ensure problem-free installation of thehouse, its stability and especially the matching of the doors. With a good foundation, your house willstand for many years more.Prepare the foundation so that its upper edge extends from the ground to a height of at least 5 cm. Atthe same time make sure that there are sufficient air apertures under the house floor for ventilation.We recommend the following foundation options: Strip or spot foundation Foundation from concrete or pavement slabs Cast concrete bedPrepare the foundation so that the foundation joists are propped up on every side with intervals notexceeding 50-60 cm.Consult an expert in this field or have the foundation prepared by specialists.3 Garden house assemblyATTENTION: The house package also includes 2-3 marked hitting blocks (wall profile approximately 20-30 cmlong).These details listed above ARE NOT mentioned in the specification list. The drawings have the details marked with three-digit position numbers. The exact positions ofthose details that have the third digit “x” can be found in the specification list.