12. Unscrew the 4 screws and remove the B/Q-Module.7.15. Removal of P-Module1. Remove the power unit according to the steps 1 through 11in the section 7.14. "Removal of B/Q Module".2. Unscrew the 4 screws and remove the P-Module.7.16. Removal of Lamp Unit1. Loosen the 2 screws until they idle, remove the lamp unitcover.2. Loosen the 2 screws until they idle, remove the lamp unitwith the handle.Note:· When installing the lamp unit in the main unit, placeit in a specified position and press the right and leftsides of the lamp unit (arrow positions shown in thefigure below), and confirm the lamp unit is insertedsecurely.Then, tighten the 2 screws fixing the lamp unit, andattach the lamp unit cover.7.17. Removal of Analysis Blockand Projection Lens1. Remove the lamp unit according to the section 7.16."Removal of Lamp Unit".2. Remove the A-P.C.Board block according to the steps 1through 4 in the section 7.3. "Removal of A-P.C.Board".3. Open the front door.4. Unscrew the 1 screw and remove the front cover (inside).5. Unscrew the 1 screw and remove the grounding terminal.6. Unscrew the 2 screws and remove the power separationwall.7. Remove the front cover.17PT-F100NTU / PT-F100NTE / PT-F100NTEA / PT-F100U / PT-F100E / PT-F100EA