October 14, 2013 7047-910 195100 I-ACCFigure 19.1Figure 19.2Figure 19.3Remove ground terminalRemove Strain ReliefG. Blower Cord Installation on Left SideThe blower cord is shipped to be installed on the right sideof the appliance. You may relocate the cord so it is on theleft side. You will need to remove the wires, flip them overand remove and reverse the male and female terminalsand re-install the wires. The wire harness and componentsare located on the back side of the right side panel.Relocating Blower Cord to Left Side1. Remove the convection blower housing from the appli-ance by removing the start-up air control knob andremoving the four 9/32 inch Allen head bots that hold thehousing to the appliance.2. Remove the green ground terminal from the housing byusing a 11/32 inch wrench and Phillips head screwdriver.Figure 19.1.3. Disconnect all the wires from the switch, rheostat andpower cord. Figure 19.2.4. Remove the strain relief with pliers. This will free thepower cord from the convection housing. Figure 19.3.5. Remove the control plate by removing the three Phillipshead screws. Remove the blank plate on the left side ofthe housing in the same manner. Swap the locations ofthe control plate and blank plate and re-install all of thefasteners. Figure 20.16. Remove the heat shield from the housing. First removethe screw on the bottom of the housing that holds theheat shield support. Second, remove the three flat headscrews that hold the shield to the housing. Figures 20.2and 20.3.7. Gently rotate the shield up to expose the connections tatare made to the snap disc. Disconnect the wires thatattach to the snap dis. Figure 20.4.8. Using pliers, pry on the tabs that retain the harnessenough to remove the harness. Do not disconnect thewires that go to the blower. Place the harness underthe tabs on the left hand side of the convection housingand bend them down enough until they hold the harness.Figure 20.59. Using pliers remove the strain relief that is on the powercord. Remove the cap that is on the hole for the strainrelief and re-install on the right side. Route power cordthrough the hole and reconnect the ground terminal toone of the screws that hold the control cover in place.Use the 11/32 inch nut that was used to hold the groundterminal on the other side. Connect the white wire onthe power cord to the long high temperature lead comingfrom the blower. Connect the black wire to the whitewire on the rheostat. Locate the new cord grip which isincluded in the component pack and install on the powercord about 2 inches further down the cord than the previ-ous cord grip was installed. Snap the cord grip back intothe housing. Figure 20.6.10. See Figure 20.1 as a reference to connect the remain-ing wires as shown.11 Reconnect the wire harness to the snap disc that islocated on the heat shield. Rotate the heat shield intoposition and reinstall the flat head screws and the sheet-metal screw that is on the bottom of the housing.12. Ensure that nothing is in the way of the blower and plugthe power cord into an outlet. Make sure that when theswitch is in ‘Auto’ position that the blower will not turnon when the rheostat is engaged. If the blower turns onwhile in the ‘Auto’ position then the wires at the switchare reversed. Simply swap them on the terminals andperform the test again.