5Manual No. 016-0230-004 Rev. F 69UltraGlideInstall the UltraGlide WiringWiring ConnectionsFor wiring connections made outside the cab, apply dielectric silicone grease (P/N 222-0000-006) generouslyon both the male and female ends of the connectors. Application of the grease will prevent corrosion to thepins and wires.Install the AutoBoom NodeFIGURE 13. Node Mounting Location1. Mount the AutoBoom node (P/N 063-0130-013) to the underside of the valve mounting plate using three3/8”-16 UNC x 1-1/4” hex bolts (P/N 311-0054-106) and three 3/8”-16 zinc flanged lock nuts (P/N 312-1001-164).2. Insert the large, rectangular node connectors on the harness cable (P/N 115-0230-052) into the correctports of the AutoBoom node.3. Tighten the bolts on the node connectors to secure the connections.Connect the Harness to the Boom Function Controls - NewerHydraulic Valves (Weatherpack Connectors)1. Locate the LEFT PRESS (PORT G1) and RIGHT PRESS (PORT G4) connectors on the harness cable(P/N 115-0230-052).2. Route the connectors to the AutoBoom valve (P/N 063-0131-124).3. Connect the LEFT PRESS (PORT G1) connector to Port G1 on the AutoBoom valve.4. Connect the RIGHT PRESS (PORT G4) connector to Port G4 on the AutoBoom valve.CAUTIONAlways connect the power cable as the laststep in the wiring process and verify that thepower leads are connected with the correctpolarity. Reversing power leads can causesevere damage to the equipment.