Chapter 1InstallationInstallationOverviewThis chapter contains information and instructions necessary toprepare the 9400 for operation. Details are provided for initialinspection, grounding requirements, repackaging instructions forstorage or shipment and installation information.NOTEThis manual is common to Models 9100A, 9200Aand Model 9400. All instruments are built on thesame platform and share specifications andfeatures except the 9100A is a single channelversion, the 9200 has two channels and 9400 hasfour channels.Unpacking andInitial InspectionUnpacking and handling of the generator requires normalprecautions and procedures applicable to handling of sensitiveelectronic equipment. The contents of all shipping containers shouldbe checked for included accessories and certified against thepacking slip to determine that the shipment is complete.SafetyPrecautionsExtreme safety precautions should be observed before using thisproduct. Although some instruments and accessories wouldnormally be used with non-hazardous voltages, there are situationswhere hazardous conditions may be present.This product is intended for use by qualified persons who recognizeshock hazards and are familiar with the safety precautions requiredto avoid possible injury. The following sections contain informationand cautions that must be observed to keep the 9400 operating in acorrect and safe environment.