Installation and maintenance instructions ecoTEC 0020029172_0325.8 Electrical connection ................................................ 195.8.1 Mains connection ...................................................... 195.8.2 Connecting controllers ............................................ 205.8.3 Connecting a low loss header sensor .................. 215.8.4 Additional relay (grey plug on the PCB)and VR40 - "2 in 7“ multifunctional module ..... 215.8.5 Wiring diagrams......................................................... 226 Start-up.............................................................. 246.1 Water circulation system ........................................ 246.2 Filling the system ...................................................... 246.2.1 Preparation of heating water ................................ 246.2.2 Filling and bleeding from the heating side ......... 246.2.3 Filling the condensate siphon ................................ 266.3 Checking the gas setting ......................................... 266.3.1 Checking for tightness of the flue gasinstallation and flue gas recirculation ................. 266.3.2 Checking the gas flow rate ..................................... 276.3.3 Checking the gas inlet working pressure............ 276.4 Checking the appliance function ........................... 286.4.1 Heating ........................................................................ 286.4.2 Cylinder charging ...................................................... 296.5 Handing over the boiler to the operator ............ 296.6 Vaillant warranty....................................................... 297 Adapting the boiler to theheating installation........................................... 307.1 Selection and setting of parameters ................... 307.2 Overview of adjustable system parameters ...... 307.2.1 Setting the heating partial load ............................ 327.2.2 Setting of pump overrun and pumpoperating mode ......................................................... 327.2.3 Setting of maximum flow temperature ............... 327.2.4 Setting of burner anti-cycling time ...................... 327.2.5 Determination of maintenanceinterval/maintenance display ................................ 338 Inspection and maintenance ........................... 348.1 Inspection and maintenance intervals................. 348.1.1 General inspection and maintenanceinstructions ................................................................. 348.1.2 Safety instructions ................................................... 358.1.3 Checking the CO 2 concentration ........................... 358.1.4 Adjusting the CO 2 concentration(or the air ratio)......................................................... 36.8.1.5 Inspection and maintenance work steps............. 378.2 Filling/draining the boiler andheating installation ................................................... 388.2.1 Filling the boiler and the heating installation .... 388.2.2 Draining of the boiler ............................................... 388.2.3 Draining the entire system ..................................... 38ContentsContents1 Notes on the documentation........................... 31.1 Storage of documents ............................................. 31.2 Safety instructions and symbols ........................... 31.3 Validity of the instruction manual ........................ 32 Description of the boiler .................................. 42.1 Design .......................................................................... 42.2 Type summary ........................................................... 52.3 CE label ........................................................................ 52.4 Intended use ............................................................... 52.5 Identification plate .................................................... 53 Safety instructions and regulations .............. 53.1 Safety instructions ................................................... 53.1.1 Installation and setting ............................................ 53.1.2 Gas odour .................................................................... 53.1.3 Changes to the surroundings of the boiler ........ 63.1.4 Important information regardingpropane-fired appliances ........................................ 63.2 General requirements .............................................. 63.2.1 Related documents ................................................... 63.2.2 Installation site .......................................................... 63.2.3 Gas supply ................................................................... 73.3 Air/flue gas duct ....................................................... 73.3.1 Standard 125 mm air/flue gas duct ...................... 73.3.2 Flue termination ........................................................ 73.4 Air supply .................................................................... 93.5 Compartment ventilation ........................................ 93.6 Electrical supply ........................................................ 94 Assembly ........................................................... 104.1 Scope of delivery ...................................................... 104.2 Accessories ................................................................. 104.3 Installation site .......................................................... 104.4 Dimension drawing and connectiondimensions .................................................................. 114.5 Required minimum gaps/installationclearances ................................................................... 124.6 Using the installation template ............................. 124.7 Mounting the boiler .................................................. 124.8 Removing/attaching the front casing.................. 135 Installation......................................................... 135.1 Heating mode ............................................................. 145.2 Cylinder charging mode .......................................... 155.3 Heating mode and cylinder charging mode ....... 165.4 Gas connection .......................................................... 175.5 Heating connection .................................................. 175.6 Expansion relief valve (safety group),heating installation ................................................... 185.7 Condensate drainage pipework ............................. 18