19ecoTEC plus 937 installation and maintenance manualRecommend straps and open carton flaps, then removeitems from the top including the polystyrene packingand remove carton by sliding up over the boiler.Ensure safe lifting techniques are used – keep backstraight – bend using legs.Keep load as close to body as possible.Always use assistance if required.Dispose of packaging in a responsible manner.Recommend wear suitable cut resistant gloves with goodgrip to protect against sharp edges and ensure goodgrip when handling appliance outside packaging.Positioning of Appliance for Final Installation – noobstructions.• If appliance weight is over 25 kg always use 2 personsto move where practical.• Fit bracket securely onto wall before lifting applianceinto position.• Obtain firm grip on front and sides of appliance, liftupwards, ensure stable balance achieved and liftupwards to position in place on bracket.• Ensure safe lifting techniques are used – keep backstraight – bend using legs - when lifting load from floorlevel.• Do not twist – reposition feet instead.• Keep boiler as close as possible to body throughoutlift to minimise strain on back.• Ensure co-ordinated movements to ensure equalspread of weight of load.• Always use assistance if required.• Recommend wear suitable cut resistant gloves withgood grip to protect against sharp edges and ensuregood grip when handling appliance.Positioning of Appliance for Final Installation – aboveworktop, foreseeable obstructions etc.• If appliance weight is over 25 kg always use 2 personsto move where practical.• Fit bracket securely onto wall before lifting applianceinto position.• Obtain firm grip on front and sides of appliance, liftupwards, onto worktop if practicable.• Ensure stable balance achieved and lift upwards toposition in place on bracket.• If 2 persons positioning onto bracket obtain firm gripat front and sides/base of boiler.• Ensure coordinated movements during 2 person liftsto ensure equal spread of weight of load.• Ensure safe lifting techniques are used – keep backstraight – bend using legs - when lifting load from floorlevel.• Do not twist – reposition feet instead.• Keep boiler as close as possible to body throughoutlift to minimise strain on back.• Avoid upper body/top heavy bending - do not leanforward/sideways.• Always use assistance if required.• Recommend wear suitable cut resistant gloves withgood grip to protect against sharp edges and ensuregood grip when handling appliance.Positioning of Appliance for Final Installation – withincompartment etc. restricting installation.• If appliance weight is over 25 kg always use 2 personsto move where practical.• Fit bracket securely onto wall before lifting applianceinto position.• Obtain firm grip on front and sides of appliance, liftupwards, onto worktop if practicable.• Ensure stable balance achieved and lift upwards todrop into place onto bracket.• If 2 persons positioning onto bracket obtain firm gripat front and sides/base of boiler.• Ensure coordinated movements during 2 person liftsto ensure equal spread of weight of load.• If 1 person positioning onto bracket recommend obtainfirm grip supporting base of boiler.• Ensure safe lifting techniques are used – keep backstraight – bend using legs - when lifting load from floorlevel.• Do not twist – reposition feet instead.• Keep boiler as close as possible to body throughoutlift to minimise strain on back.• Always use assistance if required.• Recommend wear suitable cut resistant gloves withgood grip to protect against sharp edges and ensuregood grip when handling appliance.Positioning of Appliance for Final Installation – inroof space restricting installation.• If appliance weight is over 25 kg always use 2 personsto move where practical.• Obtain firm grip on front and sides of appliance, liftupwards, ensure stable balance achieved and liftupwards to drop into place onto bracket.• If 2 persons positioning onto bracket obtain firm gripat front and sides/base of boiler.• Ensure co-ordinated movements during 2 person liftsto ensure equal spread of weight of load.• If 1 person positioning onto bracket recommend obtainfirm grip supporting base of boiler.• Ensure safe lifting techniques are used - keep backstraight – bend using legs - when lifting load from floorlevel.• Do not twist – reposition feet instead.• Keep boiler as close as possible to body throughoutlift to minimise strain on back.• Always use assistance if required.• Recommend wear suitable cut resistant gloves withgood grip to protect against sharp edges and ensuregood grip when handling appliance.• It is recommended a risk assessment of the roof spacearea be carried out before moving the appliance intothe area to take into account access, stability offlooring, lighting and other factors, and appropriatemeasures taken.Sequence of operations during installation 4