50VERSION 08/2018 ORDER NUMBER DOC 2333538IceBreaker 40-150 cm311 FUNCTION TEST AFTER REPAIR WORKAfter all repairs, the device must be checked for safe condition before recommissioning.The necessary scope of inspection and testing depends on the repair carried out and mustbe documented by the repair personnel.Activity Means1.1 Filling with separating agentSee Chapter 8.2.3.1.1.2 EX-relevant inspectionsΩm(measurement voltage500...1000 VDC)− Check grounding connection between ground connection of the pump andthe frame/trolley and between the individual components of the frame/trolley: < 1MΩ− Check conductivity between piston and grounding connection: < 1MΩThese inspections are - relevant!1.3 Testing for leaksAir motor:Test medium compressedairLeak sprayFluid section:Test medium: suitableFlushing agent− Connect the air motor to the air supply 7 bar. To perform a leak test on thedevice, the product pressure with the flushing agent is slowly increasedin increments until the maximum pressure indicated on the type plateis reached. Close pump outlet. In each position (with upstroke anddownstroke), let sit for 0.5-1 minutes and listen for audible blowing off.When the air supply is turned off, a drop in pressure must be watched for.Check seal of following modules:− fluid section− mounted fittings and regulators1.4 General inspectionsTorque wrenchVisual check− Check tightening torque of various screws. See Chapter 14.− Check all fittings.− Empty device in a controlled manner (Chapter 8.2.4) and depressurize(Chapter 7.4).− Check function of frame or transport trolley.12 DISPOSALWhen the equipment must be scrapped, please differentiate the disposal of the wastematerials.The following materials have been used:Stainless steelAluminumElastomersPlasticsCarbideConsumable productsConsumable products (lacquers, adhesives, flushing and cleaning agents and solvents)must be disposed of in accordance with all legal requirements and provisions.