54 • Fieldbus CouplerFieldbus Coupler 750-346WAGO-I/O-SYSTEM 750DeviceNet3.1.6 Configuration SoftwareTo enable a connection between the PLC and the fieldbus devices, the inter-face modules have to be configured with the individual station data.To this effect, the scope of delivery of WAGO-I/O-SYSTEM 758 includes theWAGO NETCON software intended for design and configuration, start-up anddiagnosis.Further configuration software of different manufacturers include, for in-stance, RSNetWorx.3.1.7 Starting up DeviceNet Fieldbus NodesThis chapter shows the step-by-step procedure for starting up aWAGO DeviceNet fieldbus node.AttentionThis description is given as an example and is limited to the execution of alocal start-up of an individual DeviceNet fieldbus node.The procedure contains the following steps:1. Connecting the PC and fieldbus node2. Setting the MAC ID and baud rateConfiguration with static Assembly3.1.7.1 Connecting the PC and Fieldbus Node1. Connect the fitted DeviceNet fieldbus node to the DeviceNet fieldbus PCB inyour PC via a fieldbus cable.The 24 V field bus supply is fed by an external fieldbus network power supplyover the connections V+, V- of the 5-pin fieldbus connector (MCS Series 231).2. Start your PC.3.1.7.2 Setting the MAC ID and Baud Rate3. Use the DIP switches 1...6 to set the desired node address (MAC ID). The bina-ry significance of the individual DIP switches increases according to the switchnumber.DIP switch Value1 2 02 2 13 2 24 2 35 2 4ON1 2 3 4 5ON6 7 8 87654321 g012550xFig. 3-10: Example: Setting theMAC ID 4 (DIP 3 = ON).6 2 5