10 11WL Max Technical Manual - Version 1 - May 2013Pre DeliveryInspection Procedures (PDI)CaUTION:Only competent trained technicians should work on Waterlogic products.Waterlogic units may weigh over 25KG. We recommend caution when lifting.Packing materials could present a trip hazard. Keep them off the floor.Take care not to allow the power lead to get wet. If the lead gets wet it mustnot be used.1. Remove packing straps and unpack unit and visually inspect for any damage.(Report any defects to Waterlogic as soon as possible).2. Place the unit on a suitable flat surface.3. Open the top and bottom covers by removing the screws that fix them in place.4. Visually inspect all electrical connections and power lead.5. Visually inspect all water connections.6. Remove the top cover from the Firewall Housing and inspect the quartz spiralfor damage. If all is ok then re-assemble.7. Connect to a potable drinking water supply via a 1/4” John Guest tube, the sup-ply must be limited to 3bar.8. Connect the power cord to an appropriate power supply and the machine.9. Replace all the panels and re-fit the screws.10. Select the cold dispense button until water flows clearly from the faucet.11. When the ice bank reservoir has been filled, turn on the compressor switch.Allow up to two hours for the unit to heat and chill. Test water temperatures andensure the water tastes acceptable.12. Check all functions of the WL Max.13. Turn off the power and water.14. Turn the unit around and drain from rear drain valves if fitted.15. Clean and repack ready for dispatch.16. Waterlogic recommend that all units are fully electrically (PAT) tested on site bythe commissioning engineer as damage may have occurred during transit to theunit’s final destination.