Chapter 3 Deployment Manual VIPA System 200V3-12 HB97E - IM - RE_208-1DPx1 - Rev. 14/05Project engineeringThere are the following possibilities for project engineering:• Project engineering of the 1. DP master in the System(CPU 21xDPM, IM 208)Project engineering in the hardware configurator from Siemens andtransfer via the system data into the CPU. At CPU start-up the DPmaster is configured by the CPU.• Project engineering of further DP master in the system (only IM 208)Project engineering in the hardware configurator from Siemens andexport as wld-file. The file is transferred by MMC respectively SIP-Tooland Green Cable to the DP master. With a overall reset sequence theproject is transferred to the Flash ROM of the DP master.• Project engineering with WinNCS respectively ComPROFIBUSProject engineering with VIPA WinNCS respectively ComPROFIBUSfrom Siemens and export as 2bf-file. The file is transferred by MMCrespectively SIP-Tool and Green Cable to the DP master. With a overallreset sequence the project is transferred to the Flash ROM of the DPmaster.V-Busto 1.DP-MasterPCCPU DP-MasterMMCMPI DPMMCRNSTMRFlash-ROMTip3Sec.Green CableRS232Green Cable2bf file wld fileHardware ConfiguratorComPROFIBUSWinNCSSIP-ToolPower ONSystem dataRAMMPI AdapterRNDP-Masteronly IM 208DPDP master and CPU should have a firmware version V3.0.0 or higher,otherwise the DP master may not be deployed at the CPU 21x.The according firmware version is to find on the label at the backside ofeach module.Firmware versionDP master CPU PropertiesV3.0.0 V3.0.0 1024Byte in- and output dataV3.0.4 V3.0.0 Project engineering via wld-fileV3.0.6 V3.3.0 Project engineering as HW configuration via MPIV3.0.6 --------- Overall reset of the DP masterOverviewRequiredfirmware versions