PERIODIC MAINTENANCE AND ADJUSTMENT7-16710. After the coolant is completelydrained, thoroughly flush the cool-ing system with clean tap water.11. Install the coolant drain bolt andits new gasket, and then tightenthe bolt to the specified torque.12. Pour the specified amount of therecommended coolant into the ra-diator and reservoir.13. Install the coolant reservoir cap.14. Install the radiator cap.15. Start the engine, let it idle for sev-eral minutes, and then turn it off.16. Remove the radiator cap to checkthe coolant level in the radiator. Ifnecessary, add sufficient coolantuntil it reaches the top of the radi-ator, and then install the radiatorcap, radiator cap retainer and ra-diator cap retaining bolt.17. Check the coolant level in the res-ervoir. If necessary, remove thecoolant reservoir cap, add coolantto the maximum level mark, andthen install the cap.18. Start the engine, and then checkthe vehicle for coolant leakage. Ifcoolant is leaking, have a Yamahadealer check the cooling system.19. Turn off the engine, and then in-stall the panel.1. Coolant drain bolt2. GasketTightening torque:Coolant drain bolt:10 Nm (1.0 m·kgf, 7.2 ft·lbf)1 2Antifreeze/water mixture ratio:1:1Recommended antifreeze:High-quality ethylene glycol anti-freeze containing corrosion inhibi-tors for aluminum enginesCoolant quantity:Radiator (including all routes):1.93 L (2.04 US qt, 1.70 Imp.qt)Coolant reservoir (up to the maxi-mum level mark):0.25 L (0.26 US qt, 0.22 Imp.qt)