2-18INSPADJDRIVE V-BELTDRIVE V-BELTWARNINGWhen installing the new V-belt, make sure that itis positioned from 1.5 mm (0.06 in) above theedge of the secondary sheave to –0.5 mm(–0.02 in) below the edge a.If the V-belt is not positioned correctly, the clutchengagement speed will be changed. The machinemay move unexpectedly when the engine isstarted.Adjust the V-belt position by removing or addinga spacer 1 on each adjusting bolt 2.CAUTION:As the V-belt wears, adjustment may be neces-sary. To ensure proper clutch performance, the V-belt position should be adjusted by adding a spaceron each adjusting bolt when the V-belt positionreaches 1.5 mm (0.06 in) below the edge.New belt width:34.5 mm (1.36 in)Belt wear limit width:32.5 mm (1.28 in)1. Measure:• V-belt position aNOTE:Install the new V-belt onto the secondary sheaveonly. Do not force the V-belt between the sheaves;the sliding and fixed sheaves must touch each other.V-belt position:–0.5 ~ 1.5 mm (–0.02 ~ 0.06 in)SEA2420SEA2410