InstallationInstalling the unitTransport into the dwellingCompact P is supplied in one piece on a pallet, packed in cardboard.It is fitted at the factory with 4 lifting straps, one for each top corner. This makes it possible to lift in theunit with a crane. When lifting the units with the supplied straps, these must be at an angle of max. 45°from the vertical.Nilan also offers a lifting trolley, with which the unit can be lifted directly off the pallet and into thebuilding. If the filter box is removed, the unit can be manoeuvred through an ordinary door.Positioning of unitATTENTIONWhen setting up the unit, consideration must always be given to future servicing andmaintenance.It must be easy to replace filters, and it must be possible to perform tasks such as removing theheat exchanger, replacing fans and other components.ATTENTIONA minimum free space in front of the unit of 60 cm is recommended.It is important that the unit is level in order to achieve proper run-off from the condensate tray.The unit should be positioned on a level and vibration-free substrate. In itself, the unit is low-noise andlow-vibration, but even so, account must be taken of possible vibrations which could be transferred tobuilding parts. We recommend maintaining a minimum 10 mm gap from building parts and other fixedequipment.ATTENTIONFor noise reasons, it is recommended that the unit is positioned with its rear panel against anouter wall.At the lower rear and sides there are punchedareas which can be clipped out.This avoids the necessity of cutting holesyourself.The rear angle iron on the base frame can beremoved, allowing the unit to be pushed upagainst the wall, thereby concealing the waterconnections.ATTENTIONIf a screen is mounted over the Compact P, it must be easy to dismantle this.16