Manuals database logo
manualsdatabase
Your AI-powered manual search engine

Advantech DLoG DLT-V7212 P manuals

DLoG DLT-V7212 P first page preview

DLoG DLT-V7212 P

Brand: Advantech | Category: Desktop
Table of contents
  1. intended use
  2. regulatory information
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. INTRODUCTION
  8. Warnings and notes in the operating instructions
  9. TECHNICAL CUSTOMER SUPPORT
  10. FUNCTIONAL DESCRIPTION
  11. Mount, operate and service the device correctly
  12. UNPACKING, TRANSPORTING, STORING
  13. Storage
  14. TECHNICAL DATA – DEVICE
  15. Environmental conditions
  16. Device dimensions
  17. DLT-V7210 K, KD
  18. VESA drill holes
  19. TECHNICAL DATA – RADIO MODULES (OPTIONAL)
  20. Radio card for WWAN
  21. Antennas (optional)
  22. WLAN, WWAN, LTE 4G antenna (Multiband)
  23. External WLAN antenna IEEE 802.11 a/b/g/n
  24. External WWAN antenna 2G, 3G, 4G
  25. Bluetooth
  26. CONNECTORS
  27. Network adapter (10/100/1000)
  28. Connectors under the antenna or protective cap
  29. Open/close the WLAN antenna IEEE 802.11 a/b/g/n/ac
  30. Open/close the WLAN, WWAN, LTE 4G antenna
  31. OPERATION
  32. Switching the DLT-V72 on/off
  33. Operating the touchscreen
  34. Operation elements
  35. Front side: DLT-V7210 P, R, D and DLT-V7212 P, R, D
  36. Front side: DLT-V7212 P
  37. Front side: DLT-V7210 K, KD
  38. Integrated keyboard
  39. Operating states
  40. Software keyboard (optional)
  41. Operating the DLT-V72 with UPS
  42. GENERAL DEVICE CONFIGURATION
  43. Energy options and battery pack durability
  44. Linux (optional)
  45. WLAN CONFIGURATION
  46. Configuration differences between MS Windows and Linux
  47. Customer-specific settings
  48. Advantech WLAN Client Manager (IGX Tool)
  49. Driver installation WinEmbStd7
  50. Driver installation Win7Pro / Win 8.1 IndPro / Win 10 IoT
  51. Start WLAN Client Manager, Login
  52. WLAN Client Manager functions
  53. Browse nearby wireless networks
  54. Roam Management
  55. WWAN CONFIGURATION
  56. Preparation work at the factory (DLT-V72 delivery status)
  57. Configuration of Radio card QUECTEL EC25
  58. Trouble Shooting
  59. MECHANICAL INSTALLATION
  60. Overview: Recommended mounting sequence
  61. Mounting the DLT-V72 at the deployment location
  62. Electrically isolated DLT-V72 mounting
  63. Attaching accessories to the DLT-V72
  64. Attach the mounting bracket
  65. ELECTRICAL INSTALLATION, CABLES, CABLE COVER
  66. Power cables and fuses
  67. Preparations
  68. Tools
  69. Ensure a proper electrical connection
  70. Secure the power supply cable to the strain relief rail
  71. Close off unused cable openings
  72. Pressure compensation element
  73. INTEGRATED POWER SUPPLY, POWER SUPPLY CABLE
  74. DC voltage supply connection
  75. DC Power supply cable
  76. OPTIONAL EQUIPMENT
  77. Charging the battery pack
  78. Screen defroster (optional)
  79. Keyboards and keyboard mounts (optional)
  80. Scanner and scanner bracket (optional)
  81. Protective film for touchscreen (optional)
  82. MAINTENANCE
  83. Replacing the integrated keyboard of the DLT-V7210 K, KD
  84. Attach the integrated keyboard (example)
  85. Regular maintenance work
  86. Replacing the battery pack
  87. MALFUNCTIONS AND TROUBLESHOOTING
  88. REASONABLY FORESEEABLE MISUSE
  89. GUIDELINES AND CERTIFICATES
  90. CCC, SRRC China
  91. CNROHS
  92. END-OF-LIFE DEVICE DISPOSAL
  93. LIST OF FIGURES
  94. DLT-V72 Operating Instructions V2.50
Related products
DLoG DLT-V7210 PDLoG DLT-V72 SeriesDLT-V7310PDLT-V7312DDLT-V7312RDLT-V7312PDLT-V7310RDLT-V73 SeriesDLT-M8110DLoG MTC 6 Series
Advantech categories
More Advantech categories
Manuals database logo
manualsdatabase
Your AI-powered manual search engine