Garmin GTX 23 manuals
GTX 23
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Section 1 GENERAL DESCRIPTION
- ADS-B Versions
- Interface Summary
- Technical Specifications
- Power Requirements
- GTX 23 TSO/ETSO/RTCA/ICAO Compliance
- TSO/ETSO Deviations
- Section 1 1-1 –
- Section 2 INSTALLATION OVERVIEW
- Antenna Location Considerations
- Cabling and Wiring
- Cable Routing Considerations
- GTX 23 Stand-Alone Rack (115-00629-00)
- Section 2 2-1 –
- Section 3 INSTALLATION PROCEDURE
- Backshell Assembly
- Final Installation
- Section 3 3-1 –
- Section 4 SYSTEM INTERCONNECTS
- Aircraft Power
- Discrete Functions
- Serial Data Electrical Characteristics
- RS-232 Input/Output, Software Update Connections
- Section 4 4-1 –
- Appendix A Construction and Validation of Structures
- Upward static Load Test
- Appendix B Shield Block Installation Instructions
- Shield Block Installation (78 pin example)
- Shield Termination Technique – Method A.1 (Standard)
- Insulation/Contact Clearance
- Shield Termination Technique - Method A.2 (Daisy Chain)
- Method B.1 (Quick Term) for Shield Termination
- Shield Termination-Method B.2 (Daisy Chain-Quick Term)
- Daisy Chain between Methods A and B
- D-Sub Spliced Signal Wire illustration
- Appendix C External Interface Drawings (Example Only)
- ADS-B Interconnect Examples
- TIS Display Options Example
- Appendix D Assembly and Installation Drawings
- GTX 23 Connector/Rack Assembly Drawing
GTX 23
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Section 1 GENERAL DESCRIPTION
- ADS-B Capabilities
- TIS System Capabilities
- Mutual Suppression Pulses
- Technical Specifications
- License Requirements
- Table 1-5 TSO/ETSO/RTCA/ICAO Compliance
- Table 1-6 TSO/ETSO Deviations
- Operating Instructions
- Section 2 INSTALLATION OVERVIEW
- additional equipment required
- Installation Considerations
- Cabling and Wiring
- Cooling Air
- Figure 2-2. GTX 23 Stand-Alone Rack (115-00629-00)
- Figure 2-4. GTX 23 Stand-Alone Rack, Suggested Mounting Locations
- Section 3 INSTALLATION PROCEDURE
- Backshell Assembly
- Final Installation
- Continued Airworthiness
- Section 4 SYSTEM INTERCONNECTS
- Discrete Functions
- Table 4-4 Discrete Inputs
- Serial Data Electrical Characteristics
- RS-232 Input/Output, Software Update Connections
- Appendix A CONSTRUCTION AND VALIDATION OF STRUCTURES
- Figure A-1. Upward static Load Test
- Appendix B SHIELD BLOCK INSTALLATION INSTRUCTIONS
- Figure B-1 Shield Block Installation (78 pin example)
- B.2 Shield Termination Technique – Method A.1 (Standard)
- Figure B-3 Insulation/Contact Clearance
- B.3 Shield Termination Technique - Method A.2 (Daisy Chain)
- Figure B-5 Method B.1 (Quick Term) for Shield Termination
- B.5 Shield Termination-Method B.2 (Daisy Chain-Quick Term)
- B.6 Daisy Chain between Methods A and B
- Figure B-8 D-Sub Spliced Signal Wire illustration
- Appendix C INTERCONNECT DRAWINGS (Example Only)
- Figure C-2 ADS-B Interconnect Examples
- Figure C-3 TIS Display Options Example
- Appendix D OUTLINE AND INSTALLATION DRAWINGS
- Figure D-2 GTX 23 Connector/Standalone Rack Assembly Drawing
- Figure D-3 GTX 23 in Modular Rack, Outline Drawing
- Figure D-4 GTX 23 Connector/Modular Rack Assembly Drawing
manualsdatabase
Your AI-powered manual search engine