Manuals database logo
manualsdatabase
Your AI-powered manual search engine

ABB RELION RER670 manuals

RELION RER670 first page preview

RELION RER670

Brand: ABB | Category: Power distribution unit
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Section 1 Introduction
  5. Product documentation
  6. Document revision history
  7. Related documents
  8. Document symbols and conventions
  9. Section 2 Safety information
  10. Caution signs
  11. Note signs
  12. Section 3 Environmental aspects
  13. Section 4 Unpacking, inspecting and storing
  14. Returning an IED damaged in transit
  15. Section 5 Mounting
  16. Flush mounting
  17. Mounting procedure for flush mounting
  18. panel rack mounting
  19. Mounting procedure for 19" panel rack mounting
  20. Wall mounting
  21. Mounting procedure for wall mounting
  22. Side-by-side 19" rack mounting
  23. Mounting procedure for side-by-side rack mounting
  24. Side-by-side flush mounting
  25. Mounting procedure for side-by-side flush mounting
  26. Mounting the coupling capacitor unit REX061 and shunt resistor unit REX062 (REG670 only)
  27. Shunt resistor unit REX062
  28. Making the electrical connection
  29. Front side connectors
  30. Rear side connectors
  31. Connection examples for high impedance differential protection
  32. Connecting to protective earth
  33. Connecting the power supply module
  34. Connecting the binary input and output signals
  35. Making the shield connection
  36. Making the electrical connection to the rotor and stator injection equipment (REG670 only)
  37. Coupling capacitor unit REX061
  38. Connecting injection unit REX060, coupling capacitor unit REX061 and shunt resistor unit REX062
  39. Connecting and setting voltage inputs
  40. Making of Ethernet connections
  41. Connecting remote communication interfaces LDCM
  42. Installing the serial communication cable for RS485
  43. Installing the serial communication cable for RS485 SPA/IEC
  44. Data on RS485 serial communication module cable
  45. Electrical installation
  46. Section 7 Checking installation
  47. Section 8 Removing, repairing and exchanging
  48. Sending the IED for repair
  49. Section 9 Technical data
  50. Case with rear cover
  51. Flush mounting dimensions
  52. Side-by-side flush mounting dimensions
  53. Wall mounting dimensions
  54. Section 10 Glossary
RELION RER670 first page preview

RELION RER670

Brand: ABB | Category: Protection Device
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Section 1 Introduction
  5. Product documentation
  6. Document revision history
  7. Document symbols and conventions
  8. Document conventions
  9. Section 2 Safety information
  10. Caution signs
  11. Note signs
  12. Section 3 Environmental aspects
  13. Section 4 Unpacking, inspecting and storing
  14. Storing
  15. Section 5 Mounting
  16. Flush mounting
  17. Mounting procedure for flush mounting
  18. Mounting procedure for 19" panel rack mounting
  19. Wall mounting
  20. Side-by-side 19" rack mounting
  21. Mounting procedure for side-by-side rack mounting
  22. Side-by-side flush mounting
  23. Mounting procedure for side-by-side flush mounting
  24. Coupling capacitor unit REX061
  25. Shunt resistor unit REX062
  26. Section 6 Connecting
  27. Front side connectors
  28. Rear side connectors
  29. Connection examples for high impedance differential protection
  30. Connecting to protective ground
  31. Connecting to CT and VT circuits
  32. Connecting the binary input and output signals
  33. Making the shield connection
  34. Making the electrical connection to the rotor and stator injection equipment (REG670 only)
  35. Connecting injection unit REX060, coupling capacitor unit REX061 and shunt resistor unit REX062
  36. Connecting and setting voltage inputs
  37. Making of Ethernet connections
  38. Connecting remote communication interfaces LDCM
  39. Installing the serial communication cable for RS485
  40. Installing the serial communication cable for RS485 SPA/IEC
  41. Data on RS485 serial communication module cable
  42. Installing the GPS antenna
  43. Electrical installation
  44. Section 7 Checking installation
  45. Section 8 Removing, repairing and exchanging
  46. Exchanging the IED
  47. Section 9 Technical data
  48. Case with protective cover
  49. Flush mounting dimensions
  50. Side-by-side flush mounting dimensions
  51. Wall mounting dimensions
  52. Section 10 Glossary
RELION RER670 first page preview

RELION RER670

Brand: ABB | Category: Protection Device
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Table Of Contents
  10. Table Of Contents
  11. Table Of Contents
  12. Table Of Contents
  13. Table Of Contents
  14. Table Of Contents
  15. Table Of Contents
  16. Section 1 Introduction
  17. Product documentation
  18. Document revision history
  19. Related documents
  20. Document conventions
  21. IEC 61850 edition 1 / edition 2 mapping
  22. Section 2 Application
  23. Main protection functions
  24. Back-up protection functions
  25. Control and monitoring functions
  26. Communication
  27. Basic IED functions
  28. Section 3 Configuration
  29. Description of configuration – transformer protection application in compensated networks
  30. Description of configuration – transformer protection application in solidly earthed networks
  31. Description of configuration – line protection application in compensated networks
  32. Description of configuration – line protection application in solidly earthed networks
  33. Section 4 Analog inputs
  34. Setting of the phase reference channel
  35. Example 1
  36. Example 3
  37. inputs for most commonly used CT connections
  38. Example on how to connect a star connected two-phase CT set to the IED
  39. Example how to connect single-phase CT to the IED
  40. Relationships between setting parameter Base Current, CT rated primary current and minimum pickup of a protection IED
  41. Setting of voltage channels
  42. Examples on how to connect a two phase-to-earth connected VT to the IED
  43. Example on how to connect a residually connected IED
  44. Example of analogue configuration for railway applications
  45. Configuration example 1
  46. Configuration example 2
  47. Configuration example 3
  48. Section 5 Local HMI
  49. Display
  50. LEDs
  51. Keypad
  52. Local HMI functionality
  53. Parameter management
  54. Front communication
  55. Low impedance restricted earth fault protection REFPDIF
  56. Transformer winding, solidly earthed
  57. CT earthing direction
  58. Settings
  59. Setting guidelines
  60. Elimination of zero sequence currents
  61. Protections based on the directional criterion
  62. Application examples
  63. How to wire the transformer differential protection to the IED using CTs
  64. Automatic switch onto fault logic ZCVPSOF
  65. Distance protection, quadrilateral characteristic ZRWPDIS
  66. Compensated earthing systems
  67. Solidly earthed systems
  68. High impedance earthing systems
  69. Setting examples
  70. Underimpedance protection for railway transformers ZGTPDIS
  71. Zone 1 operation
  72. Catenary Protection
  73. Wrong phase coupling protection
  74. Instantaneous phase overcurrent protection 2-phase output PHPIOC
  75. Two-step directional phase overcurrent protection D2PTOC
  76. Settings for step 1
  77. Settings for step 2
  78. Application
  79. Two step residual overcurrent protection EF2PTOC
  80. Settings for each step (x = 1 and 2)
  81. Common settings
  82. nd harmonic restrain
  83. Sensitive directional residual overcurrent and power protection SDEPSDE
  84. Thermal overload protection, one time constant, Celsius LPTTR
  85. Setting guideline
  86. Breaker failure protection CCRWRBRF
  87. Overcurrent protection with binary release BRPTOC
  88. Two step undervoltage protection U2RWPTUV
  89. Two step overvoltage protection O2RWPTOV
  90. Two step residual overvoltage protection ROV2PTOV
  91. High impedance earthed systems
  92. Underfrequency protection SAPTUF
  93. Current circuit supervision CCSSPVC
  94. Dead line detection
  95. Synchrocheck, energizing check, and synchronizing SESRSYN
  96. Synchrocheck
  97. Energizing check
  98. External fuse failure
  99. Single circuit breaker with single busbar
  100. Autoreclosing for railway system SMBRREC
  101. Auto reclosing operation Off and On
  102. Blocking of the auto recloser
  103. counter
  104. Configuration
  105. Auto recloser settings
  106. Apparatus control APC
  107. Bay control QCBAY
  108. Switch controller SCSWI
  109. Switches SXCBR/SXSWI
  110. XLNPROXY
  111. Reservation function (QCRSV and RESIN)
  112. Interaction between modules
  113. Bay control (QCBAY)
  114. Switch (SXCBR/SXSWI)
  115. Reservation input (RESIN)
  116. Configuration guidelines
  117. Signals from bypass busbar
  118. Signals from bus-coupler
  119. Configuration setting
  120. Interlocking for bus-coupler bay ABC_BC
  121. Interlocking for transformer bay AB_TRAFO
  122. Interlocking for bus-section breaker A1A2_BS
  123. Interlocking for bus-section disconnector A1A2_DC
  124. Signals in double-breaker arrangement
  125. Signals in 1 1/2 breaker arrangement
  126. Interlocking for busbar earthing switch BB_ES
  127. Interlocking for double CB bay DB
  128. Interlocking for 1 1/2 CB BH
  129. Voltage control
  130. TR1ATCC or TR8ATCC Setting group
  131. TCMYLTC and TCLYLTC general settings
  132. Logic rotating switch for function selection and LHMI presentation SLGAPC
  133. Selector mini switch VSGAPC
  134. Transformer energizing control XENCPOW
  135. Scheme communication logic for distance or overcurrent protection ZCPSCH
  136. Blocking schemes
  137. Permissive schemes
  138. Intertrip scheme
  139. Permissive overreaching scheme
  140. Weak-end infeed logic
  141. Current reversal logic
  142. Current reversal and weak-end infeed logic for residual overcurrent protection ECRWPSCH
  143. Weak-end infeed
  144. Tripping logic SMPPTRC
  145. Lock-out
  146. Blocking of the function block
  147. Logic for group alarm WRNCALH
  148. Configurable logic blocks
  149. Fixed signal function block FXDSIGN
  150. Boolean 16 to Integer conversion B16I
  151. Boolean to integer conversion with logical node representation, 16 bit BTIGAPC
  152. Integer to Boolean 16 conversion IB16
  153. Identification
  154. representation ITBGAPC
  155. Elapsed time integrator with limit transgression and overflow supervision TEIGAPC
  156. Comparator for real inputs - REALCOMP
  157. Setting example
  158. Measurement
  159. Zero clamping
  160. Gas medium supervision SSIMG
  161. Liquid medium supervision SSIML
  162. Breaker monitoring SSCBR
  163. Setting procedure on the IED
  164. Event function EVENT
  165. Disturbance report DRPRDRE
  166. Recording times
  167. Analog input signals
  168. Consideration
  169. Logical signal status report BINSTATREP
  170. Pulse-counter logic PCFCNT
  171. Function for energy calculation and demand handling ETPMMTR
  172. Access point
  173. Redundant communication
  174. Merging unit
  175. Communication protocols
  176. Receiving data
  177. IEC/UCA 61850-9-2LE communication protocol
  178. Specific settings related to the IEC/UCA 61850-9-2LE communication
  179. Setting examples for IEC/UCA 61850-9-2LE and time synchronization
  180. IEC 61850 quality expander QUALEXP
  181. LON communication protocol
  182. MULTICMDRCV and MULTICMDSND
  183. IEC 60870-5-103 communication protocol
  184. Design
  185. Settings for RS485 and optical serial communication
  186. Settings from PCM600
  187. Function and information types
  188. DNP3 Communication protocol
  189. Binary signal transfer
  190. Communication hardware solutions
  191. Authority status ATHSTAT
  192. Change lock CHNGLCK
  193. Denial of service SCHLCCH/RCHLCCH
  194. IED identifiers TERMINALID
  195. Measured value expander block RANGE_XP
  196. Signal matrix for binary outputs SMBO
  197. Frequency values
  198. Test mode functionality TESTMODE
  199. System time
  200. Process bus IEC/UCA 61850-9-2LE synchronization
  201. Current transformer requirements
  202. Conditions
  203. Fault current
  204. General current transformer requirements
  205. Restricted earth fault protection (low impedance differential)
  206. Current transformer requirements for CTs according to other standards
  207. Voltage transformer requirements
  208. SNTP server requirements
  209. IEC/UCA 61850-9-2LE Merging unit requirements
  210. Section 23 Glossary
RELION RER670 first page preview

RELION RER670

Brand: ABB | Category: Power distribution unit
Table of contents
  1. Table Of Contents
  2. Table Of Contents
  3. Table Of Contents
  4. Table Of Contents
  5. Table Of Contents
  6. Table Of Contents
  7. Table Of Contents
  8. Table Of Contents
  9. Section 1 Introduction
  10. Product documentation
  11. Document revision history
  12. Related documents
  13. Document conventions
  14. IEC 61850 edition 1 / edition 2 mapping
  15. Section 2 Safety information
  16. Caution signs
  17. Section 3 Available functions
  18. Back-up protection functions
  19. Control and monitoring functions
  20. Communication
  21. Basic IED functions
  22. Section 4 Starting up
  23. Checking the power supply
  24. IED start-up sequence
  25. Writing an application configuration to the IED
  26. Checking CT circuits
  27. Checking VT circuits
  28. Checking the binary input/output circuits
  29. Section 5 Configuring the IED and changing settings
  30. Configuring analog CT inputs
  31. Section 6 Establishing connection and verifying the SPA/IEC communication
  32. Verifying the communication
  33. Fiber optic loop
  34. Section 7 Establishing connection and verifying the LON communication
  35. The LON Protocol
  36. Optical budget calculation for serial communication with LON
  37. Section 8 Establishing connection and verifying the IEC
  38. Section 9 Testing IED operation
  39. Preparing the IED to verify settings
  40. Activating the test mode
  41. Connecting the test equipment to the IED
  42. Releasing the function to be tested
  43. Verifying analog primary and secondary measurement
  44. Testing the protection functionality
  45. Forcing of binary input/output signals for testing
  46. Enable forcing using TESTMODE function block
  47. Forcing by using PCM600
  48. operation
  49. Undo forcing by using TESTMODE component
  50. Testing disturbance report
  51. Event recorder (ER) and Event list (EL)
  52. Identifying the function to test in the technical reference manual
  53. Completing the test
  54. Verifying the restrained protection
  55. Verifying the differential alarm
  56. Initiating ZCVPSOF automatically and setting mode to impedance
  57. Distance protection zone, quadrilateral characteristic ZRWPDIS
  58. Underimpedance protection for railway transformers ZGTPDIS
  59. Current protection
  60. Verifying the settings
  61. Instantaneous residual overcurrent protection EFRWPIOC
  62. Two step non-directional earth fault protection
  63. Verifying the re-trip mode
  64. Verifying instantaneous back-up trip at CB faulty condition
  65. Fuse failure supervision FRWSPVC
  66. function
  67. Current based delta supervision DELISPVC
  68. Delta supervision of real input DELSPVC
  69. Testing the synchronizing function
  70. Testing the synchrocheck functionality
  71. Testing the energizing check
  72. Preparation of the verification
  73. Verifying the auto recloser
  74. Checking the auto reclosing conditions
  75. Secondary test
  76. Check the activation of the voltage control operation
  77. Check the undervoltage block function
  78. Check the overcurrent block function
  79. Parallel voltage regulation
  80. Testing permissive underreaching
  81. Testing blocking scheme
  82. Current reversal logic
  83. Testing the directional comparison logic function
  84. Testing the current reversal logic
  85. Testing the gas medium supervision for pressure alarm and pressure lockout conditions
  86. Liquid medium supervision SSIML
  87. Voltage harmonic monitoring VHMMHAN
  88. Metering
  89. Station communication
  90. Section 11 Commissioning and maintenance of the fault clearing system
  91. Visual inspection
  92. Recording
  93. Measurement of service currents
  94. Restoring
  95. Section 12 Troubleshooting
  96. Fault tracing
  97. Using front-connected PC
  98. Diagnosing the IED status via the LHMI hint menu
  99. Hardware re-configuration
  100. Repair instruction
  101. Repair support
  102. Section 13 Glossary
Related products
Relion 670 seriesRELION REX640RELION 650 SERIESRelion 615 seriesREL 356ReliaGear LV SG E2.2ReliaGear LV SG E4.2ReliaGear LV SG E6.2RED615 ANSISmart Communication Card
ABB categories
More ABB categories
Manuals database logo
manualsdatabase
Your AI-powered manual search engine