IBM pseries 655 manuals
pseries 655
Table of contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- safety notices
- laser safety information
- data integrity and verification
- about this book
- related publications
- Chapter 1. Reference Materials
- Documentation Overview
- Chapter 2. Installing the pSeries 655
- Service Representative Responsibility for Installation
- Weight Reduction
- Step 3. Unpack the System
- Rack Inventory
- Step 7. Install Subsystems in the 7040-W42 Frame
- Step 9. Verify that the Unit Emergency Power Off (UEPO) Switch is in the Off Position
- Step 10. Check Power Outlets and Source
- Step 11. Route and Connect Power Cords to the System
- Step 12. Install the Hardware Management Console (HMC)
- system cabling
- Install and Configure an 8-Port Asynchronous Adapter
- Install and Configure an 128-Port Asynchronous Adapter
- Step 13. Connect the External Modem
- Step 18. Have the Customer Activate the Designated Circuit Breakers
- Step 21. Set the Console's Date and Time
- Install the Rack Front Door
- Step 27. Perform HMC Setup Tasks
- Chapter 3. Verifying the Hardware Operations
- Undefined Terminal Types
- Concurrent Mode
- Running Online Diagnostics in Service Mode
- Standalone Diagnostic Operation
- NIM Server Configuration
- Chapter 4. Installation and Removal Procedures
- Powering the System Off
- Powering On the System Using the Service Processor
- Processor Subsystem Removal
- I/O Subsystems
- I/O Subsystem Removal
- Integrated Battery Feature (IBF)
- Integrated Battery Feature Removal
- PCI Adapters
- Removing a PCI Adapter Cassette
- Replacing an Adapter in a PCI Adapter Cassette
- Short Adapter or Blank Filler Installation
- Long Adapter Installation
- Appendix A. Communications Statements
- Avis de conformité aux normes du ministère des Communications du Canada
- Appendix B. Environmental Notices
- Environmental Design
- Acoustical Noise Emissions
- Appendix C. Notices
- Battery Return Program
- Appendix D. pSeries 655 Description and Overview
- Rear View
- Server Configurations
- Maximum I/O Subsystem and Processor Subsystem Configuration
- Subsystem Placement Rules
- Appendix E. System Records
- Location Codes for Server Configurations
- Device Records
- PCI Adapter Slots
- Serial Ports
- Ethernet Ports
- RIO Ports
- DASD Devices
- Appendix F. Securing the Rack
- Install the Ruggedized Frame Kit
- Attach the Rack to a Concrete (Non-Raised) Floor
- Attach the Rack to a Low-Raised or High-Raised Floor
- Install Eyebolts and Frame
- Install the Weight Distribution Plate
- Install the Frame Ground Straps
- Non-Raised Floor Environments
- Appendix G. Cabling Information
- Power Cable Part Numbers
- RIO Cables
- I/O Subsystem Cabling
- Example of I/O Cabling to Processor Subsystem (Looped)
- Appendix H. LAN and Switch Cable Installation and Management Procedures
- Cable Installation Procedure, Initial Setup
- Cable Installation Procedure, Nodes on the Left Side of the Frame
- Cable Installation Procedure, Nodes on the Right Side of the Frame
- Appendix I. Removing and Installing the Rack Top Frame
- Required Tools
- Side Cover Removal
- Remove the Rack Top Frame for Clearance Through Doorways
- Prepare for Rack Top-Frame Installation for the Reduced-Height Option
- Install the Rack Top Frame
- Replace Covers
- Index
manualsdatabase
Your AI-powered manual search engine