2 INSTALLATION AND INITIALSETUPSafety InformationBefore installing the MSH Switch 1005 into your MSH chassis, youshould consider the following safety information:n Installation and removal of the Switch 1005 should be carried out byqualified personnel only.n The Switch 1005 operates under SELV conditions (Safety Extra LowVoltage) according to IEC 950, the conditions of which are met only ifthe equipment to which it is connected is also operational under SELV.n The MSH chassis must be earthed.n Switch 1005 modules can easily be damaged by static:n Do not remove the Switch 1005 from its anti-static packaging untilyou are ready to install it into the MSH chassis.n Do not touch the pins, leads, connections or any components onthe Switch 1005.n Always handle the Switch 1005 by its edges only.n Always wear an anti-static wristband connected to a suitable earthpoint.n Always store and transport the Switch 1005 in anti-static packaging.n The MSH chassis can be powered up during Switch 1005 installation.