20GDED-IOM-215-A10 EXPLOSION VENTSThe following only applies to AAF-supplied explosion vents. Additional and/or differentsteps, equipment, etc. may be needed for vents and other equipment not supplied by AAF.Further, the following is a non-exhaustive list of recommendations, and users must carefullyread, among other things, the manufacturer’s explosion vent guide for further instructions.10.1 Installation of the explosion ventIf an explosion vent is ordered with the OptiFlo RC, the explosion vent is shippedseparately from the collector. Ensure no damage has been done to the explosion vent duringshipping or handling.The OptiFlo RC will have a frame constructed as part of the unit where the explosionvent is mounted. The number of explosion vents and location of the explosion vent will bedetailed on the collector drawing.10.2 AssemblyGripping the opposite sides, carefully remove the explosion vent from the crate thatit was shipped. Avoid excessive flexure of the explosion vent while handling.CAUTION: The edges of the explosion vent can be sharp.CAUTION: Incorrect installation of the explosion vent can cause the panel to notopen at the rated burst pressure.Place the explosion vent over the bolt holes of the frame. Make certain the dome isprotruding outwards. Install the outlet frame.Install bolts and washers (x2) and tighten hand tight.