NAM-TRS372-MT-EN-C p13/38The information in this document is the property of Automatic Systems and is confidential. The consignee withholds from using it for anything other than the use of the products or the execution of theproject to which they belong and withholds from communicating it to third parties without prior written agreement from Automatic Systems. Document subject to change without prior notice.2.5.4. Fixing the turnstile to the ground Fix the brackets (19), (20) and (42) to the anchoring bolts (21) (cf. implementation drawing, ch. 2.3. ).Note: The fixing brackets are already part of the fixing frame; it is therefore unnecessary to installadditional ones if this option is chosen. Run the electric cables through the central uprights (R) and (S). The, proceed to close the uprights andfix them as shown in fig. C: start by inserting the bolts (6) and washers (4) through the central upright, inthe fixing clamp (5). Place the upright on the double fixing bracket (42) and tighten the bolts.Note: In order to prevent corrosion, ensure that the uprights do not come in direct contact with theconcrete. Fix the end uprights (M) and (N) as indicated in fig. A. Fix the central uprights (K) and (L) as indicated in fig. B.KLMNRS4. Flat washer DIN 125 M12.5. Ground fixing clamp.6. ½ round head screw M12x30.7. Plug (ext Ø 30 .9 mm).10. Nut DIN 985 M12.11. Screw DIN 912 M12x30.13. Round plug.14. Grower washer DIN 127 M12.19. Fixing bracket.20. Fixing bracket.21. Anchoring bolt B15/30.42. Double fixing bracket.Fig. C4654221Fig. A75211946613Fig. B711421204107