NAM-TRS372-MT-EN-C p16/38The information in this document is the property of Automatic Systems and is confidential. The consignee withholds from using it for anything other than the use of the products or the execution of theproject to which they belong and withholds from communicating it to third parties without prior written agreement from Automatic Systems. Document subject to change without prior notice.2.5.7. Mobile comb assembly Start with the passageway which has the fixed comb closest to the ground (cf. ch.2.5.2. ). Position the mobile combs so as to have to lowest bar as close to theground as possible (30 mm [1.18in] ) (fig. J). Direct the mobile combs of the second passageway so as to have the lowest baras far from the ground as possible (106,5 mm [4.19in]) (fig. K). Adjust the mobile combs on the upper and lower flanges so as to close thepassageway (cf. implementation drawing & fig. L) and assemble (fig. M).Fig. JFig. KFig. LUpper flange assembly onthe mechanismCover with Loctite gluebefore tighteningMobile combMobile comb3-arm lower flange assemblyFor installation on finishedground surface only.For installation with fixing frame(option), use the axle (alreadyassembled on the fixing frame).cover with Loctite gluebefore tighteningFig. MScrew DIN 933 M12x30.Flat washer DIN 125 M12Tooth lock washer DIN 798 M12Screw DIN 933 M12x25.Flat washer DIN 125 M12Tooth lock washer DIN 798 M12Cap nut A4 DIN 1587 M10Anchoring bolt B15/30Lower axleFlat washer M10