THERMOMASSEUR ® | geysair tmaddendum to the owner’s manualTHERMOMASSEUR ®www.bainultra.comPrinted in Canada. Copyright © september 2012 Bainultra inc. all rights reserved. 45100169some products, specifications, and services mentioned in this manual are describedin pending patent applications or are protected by patents.supersedes page 22 of owner’s Manual 72. installationbalneo® - naos & sanosinstallation1. Bath site1-1 once the floor has been finished and isperfectly level, place thermomasseur® inthe exact chosen location. trace the outlineof the bath with an erasable marker.1-2 remove the thermomasseur® and carefullyplace it upside down on a blanket orcorrugated cardboard (ex. the box in whichit was delivered).1-3 on the floor, determine by referring tomeasurements taken underneath the bath,the exact location of the drain, the air pipe,and the two anchoring points at each endof the bath.Balneo ® - naos & sanos - installation2-12-22-31-1Horizontal – DrainHorizontal –AnchoringPointVertical –DrainVertical –AnchoringPointVertical –Air IntakePipe1- 3toP view2-1 install the drain and overflow set on thebath and the first section of the air intakepipe (1 1/2’’ aBs) under the floor.2-2 apply a silicone joint to the base rim.2-3 Put the thermomasseur® in place andput pipes through the floor, ensuringbath is aligned with anchoring points.for geysair-equipped baths, also runthe water hose and electrical wiringthrough the floor.2-4 wipe off excess silicone immediately.