4. QuickStartIn the office, several days prior to the planned installation date, do the following:1. Collect tools (User-supplied tools (p. 6))2. Research site (Siting and exposure (p. 10))3. Install data logger support software (ET107 software (p. 65))Once on site, do the following:1. Locate suitable site (Siting and exposure (p. 10)).2. Prepare concrete base and allow the concrete base to cure a minimum of seven days (Basefoundation installation (p. 12))3. Install the ET107 pole (Pole installation (p. 16)).4. Place instrumentation enclosure on the ET107 pole, slide the enclosure to the top of thepole, and secure it with the correct orientation (Enclosure installation (p. 19)).5. Install the crossarm and sensors (Crossarm installation procedure (p. 20) and Sensorinstallation (p. 21)).4.1 User-supplied toolsThe following tools are used for the base and pole installation.ShovelRakeOpen end wrenches: 10 mm (3/8 in), 11 mm (7/16 in), 13 mm (1/2 in), two 14 mm (9/16 in)Magnetic compass2 m (6 ft) step ladderTape measure: 4 to 6 m (12 to 20 ft)Claw hammerLevel: 60 to 90 cm (24 in to 36 in)Hand sawMaterials for concrete form:Section 4. QuickStart 6