4. Remove the template.5. Follow the ET Station Pole Assembly Instructions(https://s.campbellsci.eu/documents/eu/manuals/et-station-pole-assembly-guide.pdf) tosecure the top and base pole sections by using the self-drilling screw provided with thepole assembly.6. Cut and save a 23 cm (9 in) piece of 10 AWG ground wire, which will be used to attach theenclosure ground to the lightning rod assembly.7. Thread the communication cable, power cable with connector ends of cable out the top ofpole, and grounding wire through the pole and conduit. Electrical fish tape will help. Leaveapproximately 1 m (2 ft) of the supplied power and communication cable hanging out ofthe top of the pole. Secure all wiring so it doesn’t slip back down through the pole.NOTE:Solar panel and radio frequency (RF) options will not have power or communicationcables.8. Place the white pole cap over the pole end.9. Raise the pole on a still day.10. Place a washer on top of the two nuts on each foundation bolt.11. Taking care not to damage cables between the pole and conduit, raise the pole and lowerit onto the conduit and mounting bolts.12. Install a washer and nut on each bolt and hand tighten. Check plumb of the pole byplacing a level on the north and east sides of the lower pole section.13. Adjust the topmost of the two lower nuts (levelling nut) on each bolt as necessary.14. When plumb is established, lock the levelling nut in place by tightening the lowest nutagainst it.15. Tighten the three top nuts with the wrench.6.3.1 Pole groundingThe following components included with the ET107 are used for this installation procedure:(1) 4 AWG ground wire(1) 8 AWG ground wire(1) copper ground lug, bolt(1) ground rod, clampUse the following procedure to ground the pole (FIGURE 6-4 (p. 17) and FIGURE 6-5 (p. 19)).Section 6. Installation 18