34EnglishInstallation InstructionsMoving the Range For Service1. Close the gas-supply valve.2. Turn off power to the range at the circuit breaker or fuse box.3. Pull the range out of the cutout.4. Push the range back into place, being sure to engage the anti-tip bracket (Pg. 29).5. Turn on power to the range at the circuit breaker or fuse box.6. Open the gas-supply valve.Installation ChecklistInstallerComplete this checklist to ensure that no part of the installation was overlooked.OwnerYou are ultimately responsible for ensuring that the installation was performed properly by a qualified techni-cian. Dacor is not responsible for property damage or product failure due to improper installation of the range.F Was the plastic coating been peeled off the outside of the range?F Were all packaging materials removed from the oven chamber?F Were the leveling legs lowered to the floor and the unit leveled? (Pg. 27)F Was the range secured with the provided anti-tip bracket and foot? (Pgs. 17–21, 27)F Was the range wired/grounded and the electrical-access cover re-attached? (Pgs. 21–25)F Was the gas-supply inlet pressure adjusted within the stated maximum? (Pg. 16)F Was the range connected to the gas supply and gas-leak tests conducted? (Pg. 26)F Was the oven door re-attached? (Pg. 27)F Were the burner knobs installed? (Pg. 28)F Were the burner components and grates installed? (Pg. 28)F Was proper operation verified? (Pg. 30)F Was the warranty activated on-line or the warranty card (see the User Manual) completed and mailed?