Publication date: Feb., 2012Revision A111Figure 7: RJ-45 Connections Figure 8: SFP TransceiverEQUIPMENTCHECKLISTAfter unpacking this switch, please check the contents to be sureyou have received all the components. Then, before beginningthe installation, be sure you have all other necessary installationequipment.PACKAGECONTENTS GS-2328KX Port Series GbE Management Switch Four adhesive rubber feet Mounting Accessory (for 19” Rack Shelf, Optional) This Installation Guide User’s Manual CD AC Power Cord RS-232 to RJ-45 Console CableN OTE: Please notify your sales representative immediately ifany of the aforementioned items is missing or damaged.WARNING: The mini-GBICs are Class 1 laser devices. Avoid directeye exposure to the beam coming from the transmit port.MOUNTING The switch can be mounted in a standard 19-inch equipmentrack or on a desktop or shelf. Mounting instructions for eachtype of site as follow.RACK MOUNTING Before rack mounting the switch, please pay attention to thefollowing factors: Temperature: Since the temperature within a rack assemblymay be higher than the ambient room temperature, checkthat the rack-environment temperature is within thespecified operating temperature range (0 to 40 °C). Mechanical Loading: Do not place any equipment on top of arack-mounted unit.