• Connect port 1 of the Fibre Channel HBA in the bottom storage controller to switch 1.3 Connect Storage Center fault domain 2 (shown in blue) to fabric 2.• Connect port 2 of the Fibre Channel HBA in the top storage controller to switch 2.• Connect port 2 of the Fibre Channel HBA in the bottom storage controller to switch 2.Cable the Storage System with 4-Port Fibre Channel IO CardsConnect the Fibre Channel ports on the storage controllers to host servers with Fibre Channel HBAs. The Fibre Channel ports of thestorage controllers connect to the host servers through the Fibre Channel switches in the SAN.About this taskFigure 31. Connect the Storage System to Fibre Channel Host Servers1 Host server 2 Host server3 Fibre Channel switch 1 (member of fault domain 1) 4 Fibre Channel switch 2 (member of fault domain 2)5 SCv3000 and SCv3020 storage systemSteps1 Connect each host server to both Fibre Channel fabrics.2 Connect fault domain 1 (shown in orange) to fabric 1.• Connect port 1 of the Fibre Channel HBA in the top storage controller to switch 1.• Connect port 3 of the Fibre Channel HBA in the top storage controller to switch 1.• Connect port 1 of the Fibre Channel HBA in the bottom storage controller to switch 1.• Connect port 3 of the Fibre Channel HBA in the bottom storage controller to switch 1.3 Connect fault domain 2 (shown in blue) to fabric 2.• Connect port 2 of the Fibre Channel HBA in the top storage controller to switch 2.• Connect port 4 of the Fibre Channel HBA in the top storage controller to switch 2.• Connect port 2 of the Fibre Channel HBA in the bottom storage controller to switch 2.• Connect port 4 of the Fibre Channel HBA in the bottom storage controller to switch 2.Connect the Front-End Cabling 39