UPS SYSTEM INSTALLATIONEaton 9395 UPS (225–275 kVA) Installation and Operation Manual 164201683 Rev 3 www.eaton.com/powerquality4-2NOTE For the following steps, verify that the forklift or pallet jack is rated to handle the weight of thecabinet (see Table 3‐1 on page 3-2 for cabinet weight).1. If not already accomplished, use a forklift or pallet jack to move the cabinet to theinstallation area, or as close as possible, before unloading from the pallet. Ifpossible, move the cabinet using the pallet. Insert the forklift or pallet jack forksfrom the right side of the pallet (facing the cabinet), between the supports on thebottom of the pallet (see Figure 3‐6 on page 3-5 for the UPS cabinet center ofgravity measurements). If the cabinet must be moved using the cabinet front orrear fork lift slots, see the caution statement at the beginning of this procedure.2. Remove the three bolts securing the left side shipping bracket to the cabinet andthree bolts securing the bracket to the pallet (see Figure 4‐1). Remove the leftside shipping bracket. If installing the cabinet permanently, retain the shippingbracket and securing hardware for later use.3. Remove the three bolts securing the right side shipping bracket to the cabinetand three bolts securing the bracket to the pallet (see Figure 4‐2). Remove theright side shipping bracket. If installing the cabinet permanently, retain theshipping bracket and securing hardware for later use.4. Using a forklift (see the caution statement at the beginning of this procedure),raise the UPS cabinet section until the cabinet bottom clears the pallet byapproximately 3 mm (1/8”).5. Pull the pallet from under the UPS cabinet. Discard or recycle the pallet in aresponsible manner.6. Using a forklift (see the caution statement at the beginning of this procedure),move the UPS cabinet to the final installed location.7. Carefully lower the UPS cabinet until the cabinet base contacts the floor.8. If permanently mounting the system, proceed to Step 9; otherwise, continue toStep 11.NOTE DO NOT reinstall the left side shipping bracket, if installing a Field Installed UPM (FI-UPM).9. Using the retained hardware, reinstall the shipping brackets removed in Steps 2and 3 to the left and right side of the UPS cabinet with the angle facing outward(see Figure 4‐1 and Figure 4‐2).10. Secure the cabinet to the floor with customer-supplied hardware.11. If installing a FI-UPM, proceed to paragraph 4.3; otherwise, proceed to Step 12.12. If installing a battery system, proceed to paragraph 4.4; otherwise, proceed toStep 13.13. If installing a tie cabinet or distribution panel for a distributed bypass system,proceed to paragraph 4.5; otherwise, proceed to paragraph 4.6.