Contents - important safety instructions
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Table Of Contents
- Introduction
- Figure 1‐1. Eaton 9395 UPS (225–275 kVA) Cabinet
- Customer Interface
- Advanced Battery Management
- Separate Rectifier Input
- Energy Saver System and High Alert Modes
- Monitoring and Communication
- Basic System Configurations
- Conventions Used in This Manual
- For More Information
- Safety Warnings
- UPS Installation Plan and Unpacking
- Figure 3‐1. UPS Cabinet Dimensions (Front View)
- Figure 3‐3. UPS Cabinet Dimensions (Top View)
- Figure 3‐6. UPS Cabinet Center of Gravity
- UPS System Power Wiring Preparation
- UPS System Interface Wiring Preparation
- Distributed Bypass Power Wiring Preparation
- Inspecting and Unpacking the UPS Cabinet
- Figure 3‐8. UPS Cabinet as Shipped on Pallet
- UPS System Installation
- Figure 4‐1. Removing the Left Side Shipping Bracket
- Figure 4‐2. Removing the Right Side Shipping Bracket
- Field Installed UPM Installation
- Hole Barrel Lug Terminations to Bus Bar Installation
- External Power Wiring Installation
- Figure 4‐4. Conduit and Wire Entry Locations
- Figure 4‐5. Distributed Bypass Wire Length
- Figure 4‐6. UPS Power Terminal Locations – Common Rectifier Feed
- Figure 4‐7. UPS Power Terminal Detail AA – Common Rectifier Feed
- Figure 4‐8. UPS Power Terminal Locations – Separate Rectifier Feed
- Figure 4‐9. UPS Power Terminal Detail AA – Separate Rectifier Feed
- Battery Power Wiring
- Figure 4‐11. UPS Power Terminal Detail BB – Common Battery
- Installing Interface Connections
- Figure 4‐13. Interface Terminal Locations
- Figure 4‐14. Interface Terminal Detail
- Figure 4‐16. Terminal Blocks TB1, TB2, and TB3 Connector Assignments
- TB1 Battery Interface Connections
- Figure 4‐17. Typical Battery Interface Connection
- X-Slot Connections
- Installing a REPO Switch
- Figure 4‐21. Normally-Open REPO Switch Wiring
- Figure 4‐22. Normally‐Closed REPO Switch Wiring
- Installing Options, Accessories, and Distributed Bypass Control Wiring
- installation checklist
- Installing Options and Accessories
- Figure 5‐2. Powerware Hot Sync CAN Bridge Card Connections
- Installing Distributed Bypass Control Wiring
- Figure 5‐3. Distributed Bypass System CAN and Pull-Chain Simplified Interface Wiring
- Figure 5‐5. Distributed Bypass Pull-Chain Wiring without MOBs
- Figure 5‐6. Distributed Bypass Pull-Chain Wiring with MOBs
- Installing an Optional Remote Monitor Panel II
- Figure 5‐7. Remote Monitor Panel II and Remote Monitor Panel II Terminal Locations
- Installing an Optional Relay Interface Module II
- Figure 5‐9. J1, J2, J3, and J4 15-Pin D-Sub Connectors
- Installing an Optional Supervisory Contact Module II
- Figure 5‐11. Supervisory Contact Module II TB2
- Accessory Mounting Dimensions
- Figure 5‐13. Relay Interface Module II Dimensions
- Figure 5‐14. Supervisory Contact Module II Dimensions
- Understanding UPS Operation
- Single UPS
- Energy Saver System Mode
- Variable Module Management System
- Figure 6‐3. Path of Current Through the UPS in Bypass Mode
- Battery Mode
- Single UPS System Oneline Configurations
- Figure 6‐5. UPS System – Common Rectifier Feed, Dual‐Feed Configuration
- Figure 6‐6. UPS System with Field Installed UPM – Common Rectifier Feed, Common Battery, Dual‐Feed Configuration
- Figure 6‐7. UPS System with Field Installed UPM – Common Rectifier Feed, Separate Battery, Dual‐Feed Configuration
- Figure 6‐8. UPS System with Field Installed UPM – Separate Rectifier Feed, Separate Battery, Dual‐Feed Configuration
- Figure 6‐9. Simplified Dual-Feed UPS with Maintenance Bypass Panel
- Multiple UPS Distributed Bypass System
- Online Mode – Distributed Bypass
- Bypass Mode – Distributed Bypass
- Figure 6‐11. Path of Current through the UPSs in Bypass Mode – Distributed Bypass
- Battery Mode – Distributed Bypass
- Multiple UPS Distributed Bypass System Oneline Configurations
- Figure 6‐13. Typical Distributed Bypass System (1+1 and 2+0 Configurations)
- Figure 6‐14. Typical Distributed Bypass System (2+1 and 3+0 Configurations)
- Figure 6‐15. Typical Distributed Bypass System (3+1 and 4+0 Configurations)
- UPS Operating Instructions
- Control Panel
- Status Indicators
- Using the LCD and Pushbuttons
- Using the Menu
- Display Menu Operation
- Load Off Screen
- System Status Screen and Controls
- Single UPS Operation
- Enable Energy Saver System Mode from the UPS Command Menu
- Disable Energy Saver System Mode from the UPS Command Menu
- Enable Variable Module Management System Mode from the UPS Command Menu
- Start Variable Module Management System High Alert Mode from the UPS Command Menu
- Enable Energy Saver System Mode from the Bypass Command Menu
- Disable Energy Saver System Mode from the Bypass Command Menu
- Enable Variable Module Management System Mode from the Bypass Command Menu
- Start Variable Module Management System High Alert Mode from the Bypass Command Menu
- Starting a Single UPM
- Transfer from Online to Bypass Mode
- Transfer from Online to Bypass Mode and Shut Down UPMs
- Single UPM Shutdown
- UPS and Critical Load Shutdown
- Using the UPS LOAD OFF Pushbutton or Command
- Using the Remote Emergency Power-off Switch
- Multiple UPS Distributed Bypass Operation
- Start Energy Saver System High Alert Mode from the UPS Command Menu
- Disable Variable Module Management System Mode from the UPS Command Menu
- Starting the Distributed Bypass System in Bypass Mode
- Start Energy Saver System High Alert Mode from the Bypass Command Menu
- Disable Variable Module Management System Mode from the Bypass Command Menu
- Starting the UPS UPMs
- Transfer from Bypass to Online Mode
- Single UPM Restart
- Single UPS Shutdown using Load Off
- Single UPS Shutdown using UPM Shutdown
- Single UPS Restart
- Charger Control
- Communication
- eNotify Service
- LanSafe Power Management Software
- Terminal Mode
- Event History Log
- Figure 8‐2. Sample Event History Log
- Building Alarm Monitoring
- Relay Interface Module II
- Supervisory Contact Module II
- UPS Maintenance
- Performing Preventive Maintenance
- Figure 9‐1. UPS Filter Locations
- PERIODIC Maintenance
- BATTERY Maintenance
- Product Specifications
- UPS Output
|
TABLE OF CONTENTSEaton 9395 UPS (225–275 kVA) Installation and Operation Manual 164201683 Rev 3 www.eaton.com/powerqualityiv7.4.22 Single UPS Shutdown using Load Off 7-44. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.4.23 Single UPS Shutdown using UPM Shutdown 7-45. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.4.24 Single UPS Restart 7-46. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.4.25 UPS and Critical Load Shutdown 7-47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.4.26 Charger Control 7-47. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.4.27 Using the UPS LOAD OFF Pushbutton or Command 7-48. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.4.28 Using the Remote Emergency Power-off Switch 7-50. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8 Communication 8-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.1 X-Slot Cards 8-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.2 eNotify Service 8-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.2.1 eNotify Service Features 8-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.2.2 Installing eNotify Service 8-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.3 LanSafe Power Management Software 8-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.4 Remote Notification 8-3. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.5 Terminal Mode 8-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.5.1 Display UPS Control Panel 8-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.5.2 Event History Log 8-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.6 Building Alarm Monitoring 8-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.7 General Purpose Relay Contact 8-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.8 Remote Monitor Panel II 8-7. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.9 Relay Interface Module II 8-9. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.10 Supervisory Contact Module II 8-10. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9 UPS Maintenance 9-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.1 Important Safety Instructions 9-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2 Performing Preventive Maintenance 9-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.1 DAILY Maintenance 9-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.2 MONTHLY Maintenance 9-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.3 PERIODIC Maintenance 9-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.4 ANNUAL Maintenance 9-4. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2.5 BATTERY Maintenance 9-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.3 Installing Batteries 9-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.4 Recycling the Used Battery or UPS 9-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.5 Maintenance Training 9-5. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10 Product Specifications 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.1 Model Numbers 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2 Specifications 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2.1 UPS Input 10-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2.2 UPS Output 10-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .10.2.3 UPS Environmental 10-2. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .Warranty W-1. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . PreviousNext |