UPS Operating Instructions6-22 Eaton 9E UPS (20–30 kVA, 208/220V) Generation 3 Installation and Operation Manual P-164000301—Rev 1 www.eaton.com/powerquality6.4.10 Charger ControlTo turn an individual UPS battery charger on:1. Select the CONTROLS symbol on the main menu bar on the UPS requiring the charger to be turned on.The System Control screen is displayed.2. Select Battery on the System Control screen.3. On the Battery System Control screen, select the RESTING CHARGING command, then press theRETURN pushbutton.To turn an individual UPS battery charger off:1. Select the CONTROLS symbol on the main menu bar on the UPS requiring the charger to be turned off.The System Control screen is displayed.2. Select Battery on the System Control screen.3. On the Battery System Control screen, select the CHARGING RESTING command, then press theRETURN pushbutton.6.4.11 Battery TestTo start an individual UPS battery test:1. Select the CONTROLS symbol on the main menu bar on the UPS to be tested. The System Controlscreen is displayed.2. Select Battery on the System Control screen.3. On the Battery System Control screen, select the RESTING TESTING command, then press theRETURN pushbutton.6.4.12 Using the UPS LOAD OFF CommandA UPS Load Off is initiated by the Load Off command on the UPS Control screen. The UPS LOAD OFF controlsthe UPSs output by powering down the UPS and de-energizing the critical load.The UPSs (including Bypass) remains off until restarted.To use the LOAD OFF command:1. Select the CONTROLS symbol on the main menu bar on the UPS to be shut down. The System Controlscreen is displayed.2. Select UPS on the System Control screen.3. On the UPS System Control screen, select the NORMAL LOAD OFF or BYPASS LOAD OFFcommand depending on the UPS mode, then press the RETURN pushbutton.The Verify Action screen is displayed, providing a choice to proceed or abort the shutdown.NOTE 1 This UPS has a user initiated battery test intended to determine if thebatteries are able to support the load.NOTE 2 The battery test is only able to be initiated when the battery is fullycharged. This normally occurs within 72 hours of the start of a chargingcycle. The command will not be shown if the test is not able to be run.