INSTALLING THE UPS SIDECAREATON Powerware® 9390 UPS Sidecar Installation and Operation Manual S 164201586 Rev E www.powerware.com2-102.4.5 Installing UPS Sidecar TB1 Interface ConnectionsNOTE When installing control wiring (such as Pull Chain and MOB auxiliary contacts) to the UPS Sidecarinterface terminals, conduit must be installed between the the UPS cabinet or device and the UPS Sidecar, ifwiring cannot be run through line-up-and-match cabinets. Install the control wiring in separate conduit fromthe power wiring.1. Verify the UPS system is turned off and all power sources are removed. Refer tothe applicable Powerware 9390 installation and operation manual, listed inparagraph 1.5, for shutdown instructions.2. If not already removed, remove the screw securing the bottom of the UPSSidecar front panel (see Figure 2-1 on page 2-3). Lift up the panel and remove.3. If not already removed, remove the screws securing the internal safety shieldpanel and remove the panel to gain access to the terminals.4. To locate the appropriate terminals, and for wiring and termination requirements,see Drawing 164201546-7, starting on page A-64, and refer to the applicablePowerware 9390 installation and operation manual, listed in paragraph 1.5, forUPS cabinet terminal locations.5. Route and connect the MOB monitoring auxiliary contact wiring from the UPSSidecar to the UPMs.6. Route and connect the CAN and backup control (pull chain) auxiliary contactwiring from the UPS Sidecar to the UPMs.7. When all wiring is complete, reinstall the safety shield panels removed inprevious steps.8. Reinstall the UPS Sidecar front panel and secure with screw at the bottom of thepanel.2.5 Initial StartupStartup and operational checks must be performed by an authorized Eaton CustomerService Engineer, or the warranty terms specified on page 5-1 become void. Thisservice is offered as part of the sales contract for the UPS system. Contact service inadvance (usually a two-week notice is required) to reserve a preferred startup date.2.6 Completing the Installation ChecklistThe final step in installing the UPS Sidecar is completing the following InstallationChecklist. This checklist ensures that you have completely installed all hardware,cables, and other equipment. Completing all items listed on the checklist will ensure asmooth installation. Make a copy of the Installation Checklist before filling it out, andretain the original.After the installation is complete, a service representative will be able to verify theoperation of the UPS system and commission it to support the critical load. Theservice representative cannot perform any installation tasks other than verifyingsoftware and operating setup parameters. Service personnel may request a copy ofthe completed Installation Checklist to verify all applicable equipment installationshave been completed.NOTE The Installation Checklist MUST be completed prior to starting the UPS system for the first time.