5. External connections5.8 XV300 multi touch display as SmartWire-DT coordinatorWiringl When connecting the SmartWire-DT network to the SmartWire-DT interface, makesure to only use the following ribbon cables:SWD4-100LF8-24 with the corresponding SWD4-8MF2 blade terminals ORSWD4-(3/5/10)F8-24-2S (prefabricated cable)5.8.2.1 Commissioning the SmartWire-DT networkThe following requirements must be met before switching on the network after initialcommissioning, replacement, or modifying the SmartWire-DT configuration:l All SWD modules must be connected to each other via SmartWire-DT cables.l The SmartWire-DT network must be connected to the SmartWire-DT interface.l The power supply for the device and for SmartWire-DT must be on and connected.l The SmartWire-DT master's POW LED must be lit up with a solid light.l The status LEDs of the connected SWD modules must be flashing or showing a solidlight.l There must be a PLC project in which the SmartWire-DT master is configured (pro-ject configuration).l The PLC runtime system must be installed on the device.1≧ 2 sConfig.32Figure 38: Commissioning SmartWire-DT sequencePerform the following instructions :Press and hold down the Config button for at least 2 seconds.The SmartWire-DT master interface's SWD LED will start flashing with an orange light.The status LEDs of the connected SWD modules will start flashing.The SmartWire-DT master interface's SWD LED will start flashing with a green light.All SWD modules are addressed.The SmartWire-DT network's physical configuration will be stored in the HMI panel'snon-volatile memory as the target configuration.The SmartWire-DT master interface's SWD LED will show a solid green light.XV300 04/19 MN048017EN www.eaton.eu 71