814 Installation of ZB-S 26, 18, 18C6, 10C, 10C6 in the EBR-S-2050 electrical service roomManual: ZB-S central battery system in electrical service rooms EBR-S 40071860238 (C) November 2017 www.ceag.de15 Technical dataType ZB-S/26 ZB-S/18 ZB-S/LAD Battery cabinet ZB-S/10CElectrical service room including cable barrierand ventilation barrier.EBR-S-2050 EBR-S-2050 EBR-S-2050 EBR-S-2050 EBR-S-2050CEAG part number 40036071113 40036071113 40036071113 40036071113 40036071113Electrical service room including cable barrierand ventilation barrier. Self-assemblyEBR-S-2050 EBR-S-2050 EBR-S-2050 EBR-S-2050 EBR-S-2050CEAG part number 40036071112 40036071112 40036071112 40036071112 40036071112Installation of the system in an assembledroom is possible at a later dateno no no no noMax. airflow [m³/h] acc to. EN50272-2for boost charge*3.86 2.32Max. heat loss rate [W]* 800 700 600 13 300No. of KRS 125 cable sealings for 26 cables3 x 2.5 mm² or 10 cables at 3 x 25/16 mm²4 4 4 4 4Max. no. of 2.5 mm² cables 78 78 8 - 78Max. no. of 25 mm² cables 10 10 10 2 10Dimensions[H without stand/H with standxWxD; mm]2417/2501x1144x736 2417/2501x1144x736 2417/2501x1144x736 2417/2501x1144x736 2417/2501x1144x736Weight (approx.) room/system [kg] 692/180 692/170 692/170 692/170** 692/155AccessoriesMaximum number of supplementary KRS 125cable sealings. Max. 26 cables per cable sealing3 x 2.5 mm² or 10 cables at 3 x 25/16 mm²(see figure on page 5)6 6 6 6 6Plinth with plinth panel, width 1060 mm,H = 84 mmEBR-S-2050-SO EBR-S-2050-SO EBR-S-2050-SO EBR-S-2050-SO EBR-S-2050-SOCEAG part number 40036071115 40036071115 40036071115 40036071115 40036071115Plinth with plinth panel, width 810 mmH = 84 mm- - - - -CEAG part number - - - - -Stop rail, cable infeed incl. fixing material 40071361160 40071361160 40071361160 - 40071361160Mounting plinth for wall cabinets - - - - -Door stop, left No additional costs but 6 weeks of delivery time.O* Ventilation for the battery charge and heat dissipation must be provided. ** Without batteries14 Installation of ZB-S 26, 18, 18C6, 10C, 10C6in the EBR-S-2050 electrical service room1. Align the system and screw-fasten to the rear wall ofthe room.CAUTIONHoles must be pre-drilled for fastening screws into thefire protection material. Drill hole depth: max. 25 mm,screw length: max. 25 mm.2. Set up the technical ventilation (see the installation andoperating instructions ELECTRICAL SERVICE ROOMPRIORACK-Elt EBR)3. Disassemble the roof plate of the ZB-S. Mount thecable interception system (see the drawing).4. Feed in the cables.5. Connect the system in accordance with the CEAG ZB-Sinstructions and carry out commissioning of the system.ZB-S 26 and ZB-S 18 inEBR-S-2050ZB-S 18C6 and ZB-S 10C, 10C6in EBR-S-2050