2 INSTALLATION2.1 PRELIMINARY CHECKSBefore you install the 750 Operator, you must insure that the gateleaf meets the following criteria.:• weight of each leaf no more than 1760 lb (800 kg);• maximum length of each leaf must be 13 ft (4 m) (see tab.1);• sturdy and rigid leaf structure;• smooth and even movement of the leaves, without irregularfriction during the entire swing;• The gate must swing level• good condition of the existing hinges;• presence of mechanical limit stops.2.2 INSTALLING THE DRIVE UNIT1) Dig a foundation hole as shown in fig.4.To avoid having to create holes at the base of the post,we recommend to keep a minimum distance between therotation axis of the hinge and the post of 2.4 in (60mm)(fig.6/a).Insure that the cavity where the drive unit is located iswell drained by means of pipes, gravel drainage, or both,whatever is appropriate for your soil conditions.2) Bend the foundation plate anchor bolts.3) After the concrete is poured in the form and before it has achance to set, insert the foundation plate into the cement andposition it so that it is flush with the top of the concrete and islevel as shown in fig.5/a-b.Allow the concrete to set a minimum of two full days beforeyou install the drive unit on top of it.7 ⅞ 15 ¾4 ⅞6 to6 ⅞199114min. 2 ⅜4 ⅞6 to 6 ⅞41190°5/amin. 2 ⅜4 ⅞6 to 6 ⅞41110181990°5/b3Measurements in inchesMeasurements in inchesMeasurements in inchesMeasurements in inches7