Installation PreparationPREPARE HOT WATER LINENOTE:GE recommends copper tubing for the water line, but ifyou choose to use flexible hose, use GE'sW×28×326, flexiblebraided hose.. The water supply line (3/8" copper tubing or flexible braidedhose) may enter from either side, rear or floor within theshaded area shown in Figure F.. The water supply line may pass through the same hole as theelectrical cable and drain hose. Or,cut an additional 1-1/2"diameter hole to accommodate the water line. If power cordwith plug is used, water line must not pass through powercord hole.ACAUTION:Do not remove wood base until you are ready to install thedishwasher. The dishwasher will tip over when the door isopened if base is removed.il Shut-off_HotFromCabinetCabinet 2" From FloorFigure FWater Line Connection. If using a flexible braided supply hose, label the hose with theinstallation date to use as reference. Flexible braided hoses,elbows and gaskets should be replaced in 5 years.. Turn off the water supply.. Install a hand shut-off valve in an accessible location, suchas under the sink. (Optional, but strongly recommended andmay be required by local codes.). Water connection is on the left side of the dishwasher. Installthe hot water inlet line, using no less than 3/8" copper tubingor a flexible braided hose. Route the line as shown in Figure Fand extend forward at least 19" from rear wall.. Adjust water heater for !20°F to !40°F temperature.. Flush water line to clean out debris.. The hot water supply line pressure must be 20-120 PSI.Turn page to begin dishwasher installation,