3 - 12 Genie S-40 and Genie S-45 Part No. 102521January 2005Section 3 • Scheduled Maintenance ProceduresA-10Perform 30 Day ServiceThe 30 day maintenance procedure is a one timesequence of procedures to be performed after thefirst 30 days or 50 hours of usage, whichevercomes first. After this interval, refer to themaintenance tables for continued scheduledmaintenance.1 Perform the following maintenance procedures:• A-12 Perform Engine Maintenance -Ford and Perkins Models• A-15 Grease the Turntable Bearing andRotate Gear• B-6 Inspect the Tire and Wheels(including lug nut torque)• B-8 Check the Oil Level in the Drive Hubs• B-17 Replace the Hydraulic Filters• C-1 Perform Engine Maintenance -Deutz Models• D-2 Check the Turnable Rotation BearingBoltsA-11Perform Engine Maintenance -Deutz ModelsEngine specifications require thatthis procedure be performed after50 hours of operation.Required maintenance procedures and additionalengine information are available in theDeutz 1011FOperation Manual (Deutz part number 0297 9683)orDeutz 2011 Operation Manual (Deutz partnumber 0297 9929).Deutz 1011F Operation ManualGenie part number 52883Deutz 2011 Operation ManualGenie part number 84794CHECKLIST A PROCEDURES REV A