Part No. 102521 Genie S-40 and Genie S-45 3 - 33January 2005 Section 3 • Scheduled Maintenance ProceduresCHECKLIST B PROCEDURESREV AB-19Perform Engine Maintenance -Deutz ModelsEngine specifications require thatthis procedure be performed every400 hours.Required maintenance procedures and additionalengine information are available in theDeutz FL 2011 Operation Manual(Deutz part number 0297-9929).Deutz FL 2011 Operation ManualGenie part number 84794To access the engine:1 Remove the engine tray retaining fastenerslocated under the engine tray. Swing the enginetray out and away from the machine and secureit from moving.Crushing hazard. Failure to securethe engine pivot plate from movingcould result in death or seriousinjury.B-20Perform Engine Maintenance -Ford ModelsEngine specifications require thatthis procedure be performed every400 hours.Required maintenance procedures and additionalengine information are available in theFord LRG-425 EFI Operator Handbook(Ford part number FPP 194-302).Ford LRG 425 EFI Operator HandbookGenie part number 84792To access the engine:1 Remove the engine tray retaining fastenerslocated under the engine tray. Swing the enginetray out and away from the machine and secureit from moving.Crushing hazard. Failure to securethe engine pivot plate from movingcould result in death or seriousinjury.