REV BJune 2005 Section 3 • Scheduled Maintenance ProceduresPart No. 65162 TMZ-50/30 3 - 7A-3Perform Engine Maintenance(if equipped)Engine specifications require thatthis procedure be performed every8 hours or daily, whichever comesfirst.Proper engine maintenance, following the enginemanufacturer's maintenance schedule, is essentialto good engine performance and service life.Failure to perform the maintenance procedurescan lead to poor engine performance andcomponent damage.Required maintenance procedures and additionalengine information is available in theHatz 1B30 Engine Instruction Book(Hatz part number 433 0802 01) OR theHonda GX340 Engine Owner Manual(Honda part number 31ZH9603).Hatz 1B30 Instruction BookGenie part number 97363Honda GX340 Owner's ManualGenie part number 97361A-4Perform Hitch Maintenance -ANSI ModelsHitch specifications require thatthis procedure be performed daily.Proper hitch maintenance, following the hitchmanufacturer's maintenance schedule, is essentialto good hitch performance and service life. Failureto perform the maintenance procedures can lead topoor hitch performance and component damage.Required maintenance procedures and additionalhitch information is available in the Demco Model91 Brake Actuators Owner/Operator Manual(Demco part number BH20023).Demco Model 91 Owner/Operator ManualGenie part number 84592CHECKLIST A PROCEDURES800-610-4101ActionRental.com