SECTION 7 –SPRAY SYSTEMS7-14hose. To operate the Fence Row Nozzle, thecorresponding boom section (left or right)must be ON.80/90-ft. Spray BoomsThe Fence Row Nozzle on 80/90-ft.booms is supplied by an electric valveattached to the outer boom electric solutionvalve. Therefore, Fence Row application maybe operated by itself.FILLING YOUR SOLUTIONTANKSFront Fill-If Equipped1. Press the Solution Tank Valve Switch(es)(located on the side console) in the UPposition to OPEN the correspondingsolution tank valve(s).NOTE: Both solution tanks may be filled atthe same time.2. Remove fill port cap (located near frontof machine behind center front shield)and connect solution supply to the Solu-tion Tank Fill Port.3. Rotate the Tank Fill Valve (located nearfront of machine behind center frontshield) to the OPEN position.4. Fill tank(s) to desired level.5. When finished filling the tank(s), closethe Tank Fill Valve.6. Remove solution supply from the Solu-tion Tank Fill Port.7. Reinstall the fill port cap.8. Press the Solution Tank Valve Switch(es)(located on the side console) in theDOWN position to CLOSE the corre-sponding solution tank valve(s).Rear Fill1. Lower the Rear Fill Assembly.CAUTIONWear the appropriate clothing andPersonal Protective Equipment (PPE)when working with agriculturalchemicals. Do not store chemical-soaked clothing inside the cab.Solution Tank Valve Switches(Located on the side console)-Typical View• LeftTank• RightTank-Typical View• Fill PortCap• Tank FillValve