188 IBM System Storage N series Hardware Guide15.1 Installation prerequisitesThis section describes, at a high level, some of the planning and prerequisite tasks that needto be completed for a successful N series implementation.For more information, see the N series Introduction and Planning Guide at:http://www-304.ibm.com/support/docview.wss?crawler=1&uid=ssg1S700191315.1.1 Pre-installation checklistBefore arriving at the customer site, send the customer the relevant system specifications,and a pre-install checklist to complete. This list should contain environmental specificationsfor N series equipment: Storage controller weight, dimensions, and rack units. Power requirements Network connectivityThe customer completes the pre-install checklist with all the necessary information abouttheir environment such as host name, IP, DNS, AD, and Network.Work through this checklist with customer and inform them about the rack and floor spacerequirements. This process speeds up the installation time because all information has beencollected beforehand.After this process is complete and equipment is delivered to the customer, you can arrangean installation date.15.1.2 Before arriving on siteBefore arriving at the customer site, ensure that you have the following tools and resources: Required software and firmware:– Data ONTAP software (take note of storage platform)– Latest firmware files:• Expansion shelf firmware• Disk firmware• RLM/BMC firmware• System firmware Appropriate tools and equipment:– Pallet jack, forklift, or hand truck, depending on the hardware that you receive– #1 and #2 Phillips head screwdrivers, and a flathead screwdriver for cable adapters– A method for connecting to the serial console:• A USB-to-Serial adapter• Null modem cable (with appropriate connectors) Documentation stored locally on your mobile computer such as ONTAP documentation,HW documentation