Ssafetyelectrical viiilaser compliance statement xnotice 8notices viisecuringrack 141serial portconfiguration 136server configuration, typical 127service representative responsibilityinstallation 8setHMC date and time 28site preparation 7customer responsibility 144, 146, 150slow boot 35standalone diagnostics 35NIM server 35, 36partition considerations 35strapsframe ground 152subsystem placement rules 130switchcable 26UEPO (unit emergency power off) 13switch cableinstallation and management procedures 161system128-port asynchronous adapter 258-port asynchronous adapter 24cables 130cabling 22configuration 127, 130maximum I/O subsystem 128connect HMC (hardware management console) 17connect/route power cords 16HMC (hardware management console) to processorsubsystem 24install subsystems in 7040-42 frame 12installation 7, 39, 125inventory 10powerconnection 16recordsupdate 30subsystem placement rules 130verification 28weight reduction 9system records 131key serial number 131machine type/model 131serial numbers 131Tterminal typeidentifying 31time and dateset 28tool kitsinventory 11top frame removal 172top frameinstallation 182installation (reduced-height option) 180removal 175remove covers 172replace covers 187tools for removal 172weight of components 171trademarks xivUUEPO (unit emergency power off) 27bypass interlock 186removal and replacement 186switch 13switch assembly 186unpack system 10update system records 30Vverifyhardware 139verifying hardware operations 31viewHMC date and time 28WWeb sitesAIX documentation 33, 56, 60, 139weight distribution plateinstallation 150weight reduction 9, 10, 146determine components to remove 9order for component removal 9192 Eserver pSeries 655 Installation Guide