8AdapterEnglandAdapterAustraliaAdapterEurope, SwitzerlandFig. 7Preparations• Setting up:- Place the device on an even, stable, clean, nonslip, dryand fireproof surface�- Keep at least 20 cm of open space at the front and rearside�- When a plastic bath is used, please ensure that the heaterdoes not contact the bath�- The place for installation should be large enough andprovide sufficient air ventilation to ensure the roomdoes not warm up excessively because of the heatfrom device radiates to the environment�- Do not set up the device in the immediate vicinity ofheat sources and do not expose to sun light�• Connecting the tubings:- Unscrew the union nuts and stoppers using a wrenchfrom the pump connection IN (7) and OUT (8)�- Connect the hoses for circulating the external system tothe pump connectors M 16 x 1 for IN and OUT directlyor with the olives�- Screw the hose olive to the pump connection IN andOUT with union nuts� Slide the hoses (NW 12) onto theolives� The hoses must be secured with suitable clamps�Unpacking• Unpacking:- Please unpack the device carefully- In the case of any damage a detailed report must besent immediately (post, rail or forwarder)�Transport safetyRemove the transport pro-tection under the buoyage(4)� For HBC device, you need to open the lid (15) andremove the protection�• Delivery scope:IC control, HBC control, HBC 10 control:- IC control or HBC 5 control or HBC 10 control withthe Wireless Controller (WiCo) according to the order- Mains cables- Hose olive NW 12 (2 pieces) see Fig� 5- Screwdriver (use for safety circuit) see Fig� 6- OS 1�0 power supply (for WiCo) see Fig� 7- USB 2�0 cable Micro A – Micro B- USB 2�0 cabel A – Micro B- User guide- A warranty card�Fig. 6Fig. 5AdapterUSA, ChinaStopperUnion nutFig. 8NOTICE