6Ideal Logic System - Installation and ServicinggeneralINTRODUCTIONThe Logic system range of boilers are wall mounted, fullsequence, automatic spark ignition, low water content, fannedflue, high efficiency, condensing, system gas boilers.Note. Due to the high efficiency of the boiler a plume of watervapour will form at the terminal during operation.Central heating (CH) output is fully modulating with a range of:15 4.8 to 15kW (16,500 to 51,300 Btu/h)18 4.8 to 18kW (16,500 to 61,600 Btu/h)24 4.8 to 24.2kW (16,500 to 82,600 Btu/h)30 6.1 to 30.3kW (20,700 to 103,300 Btu/h)The boiler is supplied fully assembled with circulating pump,pressure gauge, safety valve and CH expansion vessel.A variable CH temperature control is fitted on the user control.The boiler includes as standard:- Boiler frost protection- Daily pump exercise.Note. The appliance must be wired with a permanent live supply,or the boiler frost protection will not operate. The boiler warrantywill be invalid if this requirement is not complied with.The boiler casing is of white painted mild steel.The boiler temperature control is visibly located in the controlpanel on the front of the boiler.The heat exchanger is manufactured from cast aluminium.The boiler is suitable for connection to fully pumped, sealedheating systems ONLY. Adequate arrangements for completelydraining the system by provision of drain cocks MUST be providedin the installation pipework.Pipework from the boiler is routed downwards.OpERaTIONWhen there is a demand for CH, the heating system is supplied atthe selected temperature of between 30 o C and 80 o C.The boiler features a comprehensive diagnostic system whichgives detailed information on the boiler status when operating,and performance of key components to aid commissioning andfault finding.saFE haNDLINgThis boiler may require 2 or more operatives to move it to itsinstallation site, remove it from its packaging base and duringmovement into its installation location. Manoeuvring the boilermay include the use of a sack truck and involve lifting, pushingand pulling.Caution should be exercised during these operations.Operatives should be knowledgeable in handling techniques whenperforming these tasks and the following precautions should beconsidered:• Grip the boiler at the base.• Be physically capable.• Use personal protective equipment as appropriate, e.g.gloves, safety footwear.During all manoeuvres and handling actions, every attempt shouldbe made to ensure the following unless unavoidable and/or theweight is light.• Keep back straight.• Avoid twisting at the waist.• Avoid upper body/top heavy bending.• Always grip with the palm of the hand.• Use designated hand holds.• Keep load as close to the body as possible.• Always use assistance if required.OpTIONaL ExTRa KITs• horizontal Flue Terminal (600mm long)• horizontal Flue Terminal (1000mm long)• Horizontal Flue Telescopic• Flue Extension Ducts (1000mm long)15-up to 9m18-up to 9m24-up to 9m30-up to 8m• 90 o Elbow Kit (maximum per installation).15-up to 6 elbows18-up to 6 elbows24-up to 6 elbows30-up to 6 elbows• 45 o Elbow Kit (maximum per installation).15-up to 6 elbows18-up to 6 elbows24-up to 6 elbows30-up to 6 elbows• Roof Flue Kit (to a maximum of 7.5m)• powered Vertical Flue Kit (5m primary and 17m secondaryis a typical maximum length. For alternative details refer toPowered Vertical Instructions)• Flue Finishing Kit• High Level Flue Outlet Kit• Flue Deflector Kit• Adjustable Flue Support Bracket• Balcony Flue Kit• Raised Horizontal Flue Outlet Kit• Concentric Flue screw Retaining Kit• Weather Collar (Universal)• Weather Collar (Flat Roof)• Stand-Off Kit• Stand-Off Kit (inc. pipes)• Pre-Piping Frame Kit• Condensate Pump Kit• Weather Compensation Kit• Security Bracket Kit• PRV Wall Outlet Kit• Pressure Gauge Extension Kit