CommissioningItem no. 10405047-05, Revision 0332 ( 48 )9 CommissioningDANGER: Due to flying parts.If the speed is selected incorrectly, the HF spindle or the tool may be de-stroyed and their fragments may be flung out.u Note the maximum speed for the selected tool.u Note the maximum speed for the HF spindle.u The maximum permissible speed of the HF spindle for commissioning /processing is always the lowest specified speed.Example of design: Inserting theshankNote: Ensure functionality.u Never operate the HF spindle without a clamped tool shank.If no tool shank is clamped:q The clamping system is damaged by the centrifugal forces.q The clamping system is shifted.q The balance of the HF spindle is affected.q The bearing is damaged.Ü Turn the shaft of the spindle at least ten times by hand.Ü Before storing and before commissioning only clean the cooling duct withcompressed air.9.1 Running-in scheduleDuration of load (minutes)Max. load (%)Ü Put the HF spindle into operation with a clamped tool (without machining)for approx. 10 minutes.Ü The speed in this case should be no more than 20% of the maximum per-missible speed for the HF spindle.Ä See definition: Max. permissible speedÜ Allow the HF spindle to run for approx. 2 minutes at a maximum of 50% ofthe maximum permissible speed.Ü Operate the HF spindle for approx. 2 more minutes at a maximum of 80%of the maximum permissible speed.The HF spindle is now ready for operation.