Manuale d’istruzione Sez.7 All. 9 Rev. 3 del 25.07.2013 5Contents:• Safety guidance page 6• Specifications:• Giangi CC page 7• Giangi SC page 8• Lady page 9• Marisol page 10• Miniflam page 11• Queen page 12• Stella page 13• Scintilla page 14• Scintilla 12 KW page 15• Scirocco page 16• Termoidro page 17• Selecting a location page 18• Electrical wiring page 18• Installations (pipe, vent, air-inlet) page 18• Pipe layouts page 19• Chimney calculation table page 20• Installing pellet stove vents page 21• Installing an air intake combustion chamber page 22• Hydraulic connection page 23• Water filling page 24• Kind of installation page 25• Use of fuel page 26• How to start the air/water stove (due pi board) pages 27-28• Use of remote control (due pi board) page 29• Use of automatic ignition (due pi board) select language pages 29-31• Alarm detector (due pi board) page 32• Cleaning and maintenance page 33• Electronic boards connection:• Giangi, Lady, Marisol, Scintilla, Stella, Lady, Queen page 34• Scirocco, Miniflam, Termoidro page 35