– 27 –© LEYBOLD VAKUUM GMBH GA 05.212/10 - 09/00X12X18X14 X16X17X15X13X12X18X14 X16X17X15X13X12X18X14 X16X17X15X13S6 S5S6 S5SETTING THE EQUIPMENT CONFIGURATION 5K2 not operational5.8 Jumper field S2Pins 1, 2 and 3 of the Phönix connectorX10 are used as control inputs to power theTURBOVAC on and off.Status when shipped NT 10START / STOP for NT 10START / STOP for NT 12and NT 13 Pins 4, 6 and 16 of the plug connector stripX11 are used for the NT12 as control inputsto power the TURBOVAC on and off. NT13can also be changed-over to this particularconfiguration.Status when shipped NT 12Relay K2 is disabled (not opertional)!For NT 12 and NT13: Supply N (neutralcontactor) is connected to X11.12Supply L (phase) is connected X11.14For NT 10: Supply N (neutral contactor)is connected to X10.9Supply L (phase) is connected X10.10Status when shipped NT 13 Fig. 19Fig. 20NC contact for NT 10, NT 12 and NT13(normaly closed)Changing-over thecontact assignment ofK2NO contact for NT 10, NT 12 and NT13(normaly open)Status when shipped NT 10, NT 12Fig. 21Fig. 225.7 Setting the resonance monitoring funct.Fig. 23Resonance monitoring is switched-on foroperation of TURBOVAC 50DStatus when shippedNT 10, NT 12, NT 13Fig. 25Fig. 24OFFResonance monitoringfunction ONResonance monitoring is switched-off foroperation of the TURBOVAC 50