– 3 –© LEYBOLD VAKUUM GMBH GA 05.212/10 - 09/00TABLE OF CONTENTS4.3 Electrical connection ............................................................. 194.3.1 Connecting the relay contacts (also refer to Fig. 8) ........ 194.3.2 Connecting the test sockets ........................................... 204.4 Operating modes/remote control .......................................... 214.5 Operator control .................................................................... 215 SETTING THE EQUIPMENT CONFIGURATION ......... 225.1 Selecting the supply voltage range ....................................... 225.2 Withdrawing the PC boards ................................................... 235.2.1 NT10 ............................................................................... 235.2.2 NT12 ............................................................................... 235.2.3 NT13 ............................................................................... 235.3 Locations of the plug-in and jumpers ................................... 245.4 Relay statuses ..................................................................... 255.5 Setting the configuration of relay K1 .................................... 265.6 Setting the configuration of relay K2 .................................... 265.7 Setting the resonance monitoring funct. .............................. 275.8 Jumper field S2 .................................................................... 275.9 Measuring the motor frequency ........................................... 285.10Connecting examples for remote control ............................. 29EC DECLARATION OF MANUFACTURE ......................... 32EC DECLARATION OF CONFORMITY ............................ 33FACTORY CERTIFICATE ................................................ 34FIGURESFig.1 TURBOTRONIK NT10 ............................................................ 6Fig.2 TURBOTRONIK NT12 ............................................................ 6Fig.3 TURBOTRONIK NT13 ............................................................ 6Fig. 4 Dim.drawings of the Turbotronik NT10, NT12, NT13 .............. 8Fig. 5 Rear panel of the TURBOTRONIK NT10 .............................. 12Fig. 6 TURBOTRONIK NT 12, pin assignment ............................... 16Fig. 7 TURBOTRONIK NT 13, pin assignment ............................... 20Fig. 8 Voltage at the front panel test sockets ................................. 20Fig. 9 Setting the supply voltage range .......................................... 22Fig.10 Supply voltage selector switch TURBOTRONIK NT12 ....... 22Fig. 11 Layout Platinen NT10 ........................................................ 24Fig. 12 PC board layouts NT12 and NT13 ..................................... 25Fig. 13 - 17 Setting the configuration of relay K1 ........................... 26Fig. 18 - 22 Setting the configuration of relay K2 ...................... 26/27Fig. 23 Setting the resonance monitoring function ......................... 27Fig. 23 - 26 Jumper field S2 ...................................................... 27/28Fig. 28 Diagram, measuring the motor frequency ........................ 28Fig. 29 Measuring the motor frequency. ........................................ 28Fig. 30 - 35 Connecting examples for remote control .................. 29Note (5/3) = refers to figure. The first digit refers to the numberof the figure, the second digit to the position.