1192. Confirmation of Unit SetupMake sure that all the disk drives are started ( READY LEDs lit) and the POWER LEDs on the frontfaces of both the Disk Array Unit and the Disk Enclosure are lit. Also make sure that the SVP/DIRLED on the rear face of the Disk Array Unit blinks.Then start the Maintenance PC according to Section 1.2.2.1 Confirmation of FC Port ConfigurationSelect [1.Status] ā [2..Control Port Status] to confirm the settings of FC Port Configuration.When WWN is not definedWhen WWN is definedThis function displays the FC Port status. The displayed items are as follows:Port Port name (setting value)Host Type Host type (setting value)Link Attach Setting value for Topology of LinkSwitch Setting value for SwitchData Rate Setting value for Data Rate on FC Link